Purpose: The purpose of this exercise is to show you how to set up some basic data for sub contract.
Windows:
Sub Contract Basic Data
General exercise for Sub Contract Basic Data and Requirements
Purpose: The purpose of this exercise is to show you how to set up some basic data for sub contract.
Windows:
Purchase Part
General exercise for Purchase Parts Basic Data and Requirements
Purpose: The purpose of this exercise is to show you the required data that is used in the exercises below.
Prerequisite: The Copying Sub Contract exercise must have been completed.
Create the sub contract.
General exercise for Creating Sub Contract
Purpose: The main purpose of this exercise is to show you how to create, modify and delete sub contract lines and items. We will use the HVAC System sub contract for this lesson.
We copied lines and items to the HVAC System sub contract at its creation. We will now use some of these lines and items to modify as well as delete any lines and items that are not related to the installation of a HVAC system.
A quick recap - The purpose of the HVAC System sub contract is to install adequate heating-ventilation-air conditioning facilities for a new housing complex.
Windows:
Sub Contract
Note It is recommended that you complete the exercises in Connecting Sub Contract Items to Project Activities before starting with this lesson.
Line #1 Line Name Line Description Heating System Install Heating System Items for Line #1 Item Name Item Description Calculation Method Value Combustion Chamber Furnace Fixed 20,000.00 Vents Furnace Vents Fixed 10,000.00 Pipes Intake/Exhaust Fixed 5,000.00 Line #2 Line Name Line Description Ductwork Duct System Items for Line#2 Item Name Item Description Fixed Quantity Unit Code Value Install Supply and Return ducts Fixed - - 14,000.00 Humidifier Humidifier (Supply) Fixed - - 5,000.00 Air filter Air filter Fixed - - 3,000.00 Dampers Dampers Fixed - - 8,000.00 Insulate Insulation/Fabrication of duct system Per Unit 800 PCS 1,000.00
Note: Make sure to replace all instances of XX with your initials.
Item Name/Description Calculation Method Purchase Part Site Purchase Part Value AC Compressor Fixed Enter a purchase part site (alternatively use site 1 or XX1) Enter the part number of the purchase part. 10,000.00 AC Line Fixed N/A N/A 5,000.00
Note: In order to delete a sub contract line, all corresponding items must have previously been deleted.
Prerequisite: The Change Project information on Sub Contract exercise which is found in the Connecting Sub Contract Items to Project Activities lesson must have been completed.