Purpose: The purpose of this exercise is to show you the required data that is used in the exercises below.
Create the sub contract.
General exercise for Creating Sub Contract
Purpose: The purpose of this exercise is to show you the required data that is used in the exercises below.
Windows:
Projects
General exercise for Creating Projects
Purpose: The purpose of this exercise is to show you the required data that is used in the exercises below.
Windows:
Project
General exercise for Building a Project Plan
Purpose: The main purpose of this exercise is to show you how to connect a project and project activity to a sub contract/item. In this lesson, we will connect two different projects to the HVAC System sub contract. The first project we connect is automatically set to be the default project for the sub contract. The lesson will also include an exercise on how to select a different project as the default sub contract project. Further, we will also learn how to modify project information on a sub contract item.
Note1: In the Create Sub Contract - Extended lesson we selected the Activity Required check box for the HVAC System sub contract. Therefore, the default project information will automatically appear on new contract items. It is probable that the default project/sub project/activity is not valid for a particular contract item, and should not be connected to it. In such an instance, it will be possible to change the default project information and enter the correct project/sub project/activity. This scenario is covered in this lesson.
Note2: Project information will not be transferred to the items that were created prior to the project connection. The connection must be established manually. This scenario is covered in this lesson.
Prerequisites: The HVAC System sub contract must have been created (in the Copying Sub Contract exercise)
Windows:
Sub Contract
Note: Optionally, you can define a sub project and activity sequence for the sub contract at the same time you connect the project. This scenario is covered in the following exercise.
Purpose: The purpose of this exercise is to show you how to manually connect a project activity to a sub contract item.
Prerequisites: Lines and items must have been defined on the sub contract.
Purpose: The purpose of this exercise is to show you how to change the default project information on a new sub contract line item.
Prerequisites: See the following list.
Two or more projects with sub projects and activities must have been connected to the sub contract.
The Activity Required check box must have been selected (in the Defaults tab).
A new line item is required. Use the Add Sub Contract Lines and Items exercise to create a new sub contract item. Use the information in the following table:
Line Name/Description Item Name Item Description Initialization Test Do Load Test
Note: Once the new item is saved, the default project information appears automatically.