Create Linear Asset Components—Exercises
Required Data
Create Linear Asset
Purpose: The purpose of this exercise is to show you how
to set up the linear asset that is required for performing the exercises below.
- Create a new linear asset with the ID M6EB.
General exercise for
Creating Linear
Asset
Main Exercise
Purpose: The purpose of this lesson is to learn how to
create the components for a linear asset.
Purpose: The purpose of this exercise is to create a
segment that will belong to the linear asset.
Windows:
Linear Asset/Segments
- Open the Linear Asset
window.
- Search for the Linear Asset ID M6EB.
- Click the Segments tab.
- Click New(+).
- The system automatically filled in values for these fields:
- UoM Length
- Offset X
- Offset Y
- Offset Z
- UoM Offset
- Site
- In the Segment ID field, enter M6EB-L1.
- In the Description field, enter Inside Lane.
- In the Start Point field, enter 0, as the start point at where
the segment should begin.
- In the End Point field, enter 2,8, as the end point, at where the
segment should end.
- Click Save.
- Repeat steps 4-10 to create segments with following details:
Segment ID |
Description |
Start Point |
End Point |
M6EB-L1-2 |
Inside Lane |
2,8 |
3 |
M6EB-L1-3 |
Inside Lane |
3 |
6,5 |
M6EB-L3 |
Outside Lane |
0 |
6,5 |
Purpose: The purpose of this exercise is to create a
element on the linear asset.
Windows:
Linear Asset/Elements
- Open the Linear Asset
window.
- Search for the Linear Asset ID M6EB.
- Click the Elements tab.
- Click New(+).
- The system automatically filled in values for these fields:
- UoM Length
- Offset X
- Offset Y
- Offset Z
- UoM Offset
- Site
- In the Element ID field, enter 0.
- In the Description field, enter Start of Road.
- In the Start Point field, enter 0, as the start point at where
the element should begin.
- In the End Point field, enter 0, as the end point, at where the
element should end.
- Click Save.
- Repeat steps 4-10 to create elements with following details:
Element ID |
Description |
Start Point |
End Point |
5000 |
Mile marker |
5 |
5 |
TU01 |
Tunnel |
5,1 |
5,2 |
6500 |
End of Road |
6,5 |
6,5 |
Purpose: The purpose of this exercise is to connect an
object on the element. As an example we are going to register a pump object that
will transport water in the tunnel.
Windows:
Linear Asset/Elements/Design
Objects
- Open the Linear Asset
window.
- Search for the Linear Asset ID M6EB.
- Click the Elements tab.
- Select Element ID TU01.
- Click the Design Objects tab.
- Click New(+).
- The system automatically filled in values for these fields:
- In the Object ID field, enter PM-312-PA-502.
- Click Save.
- Click the Equipment Objects tab. You will see that the functional
object for PM-312-PA-502 has automatically be entered.
Note: If you would have entered the equipment object, PM-312-PA-502
in
Linear Asset/Elements/Equipment
Objects tab,
then the design object would have automatically been registered.
Purpose: The purpose of this exercise is to register a
connection on the linear asset. A connection displays what type of relation a
linear asset has with another linear asset.
Windows:
Linear Asset/Connections
- Open the Linear Asset
window.
- Search for the Linear Asset ID M6EB
- Click the Connections tab.
- Click New(+).
- Create connection type, Intersection, if you have not already created it.
General exercise for
Creating
Connection Type
- In the Connection Type field, select Intersection from the List of
Values.
- Create Linear Asset M4EB from Asset Design, if you have not already created
it.
General exercise for
Creating Linear Asset from
Asset Design
- In the Conn LA ID field, select M4EB.
- In the Element ID field, select 6500 from the List of Values.
- In the Conn Element ID field, select 5500 from the List of Values.
- Click Save.
Purpose: The purpose of this exercise is to create a
section with specific pre-posting information on the linear asset.
Windows:
Linear Asset/Sections
- Open the Linear Asset
window.
- Search for the Linear Asset ID M6EB.
- Click the Sections tab.
- Click New(+).
- The system automatically filled in values for the UoM Length.
- In the Section ID field, enter S.
- In the Description field, enter Staffordshire.
- In the Start Point field, enter 0, as the start point at where
the section should begin.
- In the End Point field, enter 4, as the end point, at where the
section should end.
- Click Save.
- Repeat steps 4-10 to create section with following details:
Section ID |
Description |
Start Point |
End Point |
B |
Birmingham |
4 |
6,5 |
- Click on the first section and choose the right-mouse button choice
Pre-Postings.
- Note that the Cost Cent field is prefilled with the value from
the linear asset.
- Click Cancel.
- Click on the second section and choose the right-mouse button choice
Pre-Postings.
- In the Cost Cent field, change the value to 380 (manually or by
clicking on the List button and choose from the List of Value).
- Click OK.