Machine Operation Load In Standard Hours

[About Manufacturing Visualizer] [About Visualization for Machine Availability]

Usage

This bar chart displays information about the machine load per operation in standard hours for a selected time period.

When X-Axis option is set to Include Non-Load Days a shop order operation may be rescheduled by selecting a bar segment and use drag-and-drop.

Note: Only load on the days from search result will be shown in the chart. I.e. if your search result gives two specific shop orders the chart will show the total load only on the days and work centers where these two shop orders has load. If you have the X-Axis option is set to Include Non-Load Days additional days may be displayed in chart without load. This doesn't mean the days does not have load, only that the given result set does not have load on these days.

Configuration:

Window

The below windows can be configured to display this visualization chart:

Shop Order
Shop Orders
DOP Order
DOP Orders
DOP Header
DOP Headers
Shop Order Operations
Machine Load per Work Center
Labor Load per Labor Class
Machine Load Details
Labor Load Details
Operations per Work Center
Orders per Work Day
Orders per Work Center

Related Window Descriptions

Shop Order
Shop Orders
DOP Order
DOP Orders
DOP Header
DOP Headers
Shop Order Operations
Machine Load per Work Center
Labor Load per Labor Class
Machine Load Details
Labor Load Details
Operations per Work Center
Orders per Work Day
Orders per Work Center

Activity Diagrams

Create shop order
Handle shop order
Manage manufacturing visualizer

Activities

Analyze load details
Plan shop order
Release shop order
Park shop order
Unpark shop order
Schedule shop order
Perform operation split
Adjust split operations
Reschedule shop order operation using drag-and-drop
Set preferred resource
Configure visualizer settings
Configure visualizer tooltip
Create snapshot
Select visualization