Entering Preposting Shop Orders—Extended Exercises
IMPORTANT |
It is extremely important
that you set up and work within your own site to maintain your
data integrity. If you work within any other site, you will
compromise your own exercise data as well as the data of other
students. Predictable exercise results require that your data
be isolated in your own site. |
Basic Data Setup
Discrete Manufacturing Overview Racing Engine
Purpose: The purpose of this exercise is to create the
required data that will be used in the Discrete Manufacturing exercises. This
sets up data for your site that only needs to be done once for Discrete
Manufacturing course exercises.
- Set up your site for discrete manufacturing of racing engines.
General
exercise for Overview of Discrete Manufacturing Data
Inventory Location
Purpose: The purpose of this exercise is to set up an
inventory picking location for running functionality isolated by site.
Windows:
Inventory Locations
- If you haven't done so already, create the inventory picking location
shown in the table
below.
Site |
Location No |
Warehouse |
Location Name |
Location Group |
Your Site |
2C |
Sub |
Subassembly inv |
30 |
General exercise for
Entering Inventory Locations
Required Data
Posting Controls
Purpose: The purpose of this exercise is to verify that
the pre-posting controls for shop orders has been set up for use in the main exercises below.
Windows:
Posting Control
- Verify that the three posting type and code part name combinations, shown
on the table below, exist
for your company. If there is a value in the Default Value column,
record the value for future reference.
Posting Type |
Posting Type Desc |
Code Part Name |
Control Type |
Default Value |
M105 |
Preaccounting Shop Order |
Account |
AC2 |
|
M105 |
Preaccounting Shop Order |
Cost Ctr |
AC2 |
|
M105 |
Preaccounting Shop Order |
Project |
AC2 |
|
General exercise for Posting Control
Shop Orders
Purpose: The purpose of this exercise is to set
up manually-created shop orders with default information that will be
modified in the main exercises below.
- Create shop orders for the parts and lot sizes identified in the table
below. The shop orders may have a status of Planned or Released.
- Record the shop order numbers so that it will be
easy to identify the correct shop order for each main exercise.
Site |
Part No |
Part Description |
Lot Size |
Shop Order Number |
Relevant Exercise |
Your Site |
21-230 |
Electrical System |
10 |
|
Entering Pre-posting Information and Verifying Accounting Transactions |
Your Site |
21-230 |
Electrical System |
10 |
|
Verifying Accounting Transactions |
General
exercise for Creating Shop Orders Manually
Inventory Part Balance
Purpose: The purpose of this exercise is to verify that
you have enough parts to complete the main exercises.
Windows:
Inventory Part Currently On Hand
Receive Inventory Part
- Verify that you have at least the quantity of parts shown on the table
below available for manufacturing. If you do not, receive the indicated quantity of parts into
inventory picking locations.
Site |
Part Number |
Part Description |
Quantity Available for Manufacturing |
Your Site |
21-330 |
Ignition System |
20 |
Your Site |
21-331 |
Starting System |
20 |
Your Site |
21-332 |
Battery System |
20 |
General exercise for
Receiving
Inventory Part
Main Exercises
Purpose: The purpose of these exercises is to identify
preposting information on a shop order.
Windows:
Shop Order
Operation History
Labor History
Inventory Transaction History
The accounting for a specific shop order for electrical systems needs to use
preposting accounting rules. You want to:
- Identify preposting information for one shop order for 10 electrical
systems.
- Receive the 10 electrical systems and compare the accounting transactions
to a different shop order for 10 electrical systems.
You want to identify preposting information for one shop order for 10
electrical systems.
- Open the
Shop Order window and query for the shop order for
this exercise. If you did not record
the shop order number, query for your site, part number 21-230 and a quantity
of 10. If the status of the shop order is Planned, release the shop
order.
- Right-click anywhere in the header, point to Costing, and then click Pre
Posting.
- When the
Pre Posting window displays, use the List button to
select the appropriate values for the Account
and Cost Ctr fields. Do not enter a value in the Project field
because this is only for shop orders created with IFS/Project. Record the values you
selected so you can use them in
the next exercise. Click OK to save the
information.
You want to receive the 10 electrical systems and compare the accounting
transactions to a different shop order for 10 electrical systems.
- Right-click anywhere in the header of the
Shop Order window,
point to Material Actions, and then click Manual Receive.
- When the
Receive Shop Order window displays, select both the Receive
With Backflush check box and the Auto Report Of Operations check box.
- On the
Inventory Receipt tab (in the
Receive Shop
Order window), find the record for location 2C and enter 10 in
the Quantity Received field. Save the information and close the
Receive Shop Order window.
When you receive the 10 electrical systems using backflush of component material
and automatic reporting of operations, several accounting transactions are
created using the preposting information instead of the standard values for work
in progress.
- Open the
Shop Order window and query for the second shop order for
this exercise. If the status of the shop order is Planned, release the shop
order.
- Right-click anywhere in the header of the
Shop Order window,
point to Material Actions, and then click Manual Receive.
- When the
Receive Shop Order window displays, select both the Receive
With Backflush check box and the Auto Report Of Operations check box.
- On the
Inventory Receipt tab (in the
Receive Shop
Order window), find the record for location 2C and enter 10 in
the Quantity Received field. Save the information. Close the
Receive Shop Order window.
Since this shop order did not have preposting controls set up, receiving the 10 electrical systems using backflush of component material
and automatic reporting of operations will result in several accounting transactions
using the standard values for work in progress.
- Open the Operation History window and query for both
shop orders. Click the
Accounting tab. Study the differences
between the transactions for the two shop orders.
- Open the Labor History window and query for both
shop orders. Click the
Accounting tab. Study the differences
between the transactions for the two shop orders.
- Open the
Inventory Transaction History window and
query for both shop orders. Click the
Accounting tab. Study
the differences between the transactions for the two shop orders.