Transfer VIM Template Structure to Manufacturing - Extended Exercises
Basic Data Setup
Setting Up VIM Template Structure Transfer
Purpose: The purpose of this exercise is to show you how to
set
up the basic data required for running this particular functionality.
Windows:
Manufacturing Standard Basic Data
Manufacturing Standards Basic Data/Default Part Template
If you not already have, you need to do the following:
- Enter a manufacturing engineer.
- Set up an engineering transfer site role.
- Set up the default part template.
General exercise for
Setting up VIM Template Structure
Transfer
Required Data
Initial Transfer to Manufacturing
Purpose: The purpose of this exercise is to verify that
transfer had previously been done on your site.
Windows:
Transfer Template Structure
- Open the
Transfer Template Structure window.
- Query for top template part
number 11000.
- Click the
Transfer Template Structure/Transfer to Site
tab. Verify the value of Date Last Transferred and Last Phase In Date
on your site XX90. These fields show when the last transfer was done and
at what date structure revision is phased in. If these fields blank you
need to do initial transfer exercise.
General exercise for
Transfer VIM Template Structure Transfer to Manufacturing
Creating New Engineering Part
Purpose: The purpose of this exercise is to show you how to
create new engineering part to be transferred.
Windows:
Engineering Parts
- Create the part shown in the figure below.
Part no. |
Std. Name ID |
Part Description |
Unit Code |
After Delivery Serial Tracking |
Inventory Serial Tracking |
Provide Code |
11000-3-2-05 |
0 |
Module 3, EMU 2, Part 5 |
PCS |
Not Serial Tracking |
Not Serial Tracking |
Make |
11000-90-5 |
0 |
Engine 11000, Accy Part |
PCS |
Serial Tracking |
Serial Tracking |
Make |
General exercise for Establishing
New Part
Revising VIM Serial Structure Template
Purpose: The purpose of this exercise is to show you how to
add new component to VIM serial structure template.
Windows:
Serial Structure Template
- Open the
Serial Structure Template window.
- Query for part number 11000-3-2.
- Click the
Serial Structure Template/Consist Of
tab.
- Right-click and then click Add Structure Position.
- On dialog
Add Structure Position, enter 145 in
Structure Position field, enter part 11000-3-2-05 revision R01 in Part
No field, enter 5 in Position field, 4 in Quantity
field, 50 in Sorting Code field and '-' in Life Limited
Part.
- Click OK to confirm addition of component.
- Enter 723205 in Catalog Number field.
- Save changes.
- Right-click and then click Status/Set Active.
Adding Alternates Definition
Purpose: The purpose of this exercise is to verify whether
alternative part definitions exist for installed components.
Windows:
Template Alternates
Serial Part
- Open Serial Part window.
- Query for part number 11000-90-5. In the Life Limited list, click
Not Life Limited.
- Save changes.
- Open the
Template Alternates window.
- Query for template part number 11000.
- Verify that alternates are defined for installed component 11000-90.
- Create a new row, and then enter the information shown in the figure
below.
- Save changes.
Template Part Number |
Template Part Revision |
Installed Part Number |
Installed Part Revision |
Alternate Part Number |
Alternate Part Revision |
Interchangeability Code |
11000 |
R01 |
11000-90 |
R01 |
11000-90-5 |
R01 |
2 |
Adding Maintenance Level to Assembly and Disassembly Structures
Purpose: The purpose of this lesson is to create all
possible Maintenance levels for any parts that you wish to maintain.
Windows:
Repair Setup Basic Data/
Maintenance Level
Repair Setup Basic Data/
Maintenance Level Part
Maintenance Level Structure
General exercise for
Define and Maintain Maintenance Level
Structure
Verify maintenance level definition.
- Open Maintenance Level
tab.
- The maintenance levels below should appear in your site. If not you
will need to create one.
Maintenance Level |
Maintenance Description |
ML10 |
maint level 1 |
Verify maintenance level part definition.
- Open
Maintenance Level Part
tab.
- Query for maintenance level ML10.
- The maintenance level part for position part 06C/7200 below should appear
in your site. If not you
will need to create one.
Part No |
Part Description |
Site |
Maintenance Description for Part |
06C/7200 |
Engine 11000 |
XX90 |
maint level 10 |
- Open
Maintenance Level Structure window.
- Query for position part 06C/7200, structure revision 1 on your site XX90.
- The definition maintenance level structure below should appear in
your site for maintenance level ML10. If not you
will need to create them.
Included |
Line Item No |
Component Part |
Part Description |
Qty Per Assembly |
TRUE |
1 |
06C/7210 |
Module 1 |
1 |
TRUE |
2 |
06C/7220 |
Module 2 |
1 |
TRUE |
3 |
06C/7230 |
Module 3 |
1 |
TRUE |
4 |
06C/720090 |
Engine 11000, Accy Part |
2 |
FALSE |
5 |
06C/7240 |
Module 4 |
1 |
Main Exercise
Purpose: The purpose of this lesson is
to create a new revision of
assembly and disassembly structures and transferring the modifications
information.
Windows:
Template Part
Affected Parts
Transfer Template Structure
Part
Inventory Parts
Product Structure
Modification Repair Code
Maintenance Level Structure
You have already transferred 11000 Engine to IFS/Manufacturing.
However due to addition of component and alternate on a sub-assembly in VIM
serial structure template you need to have these revised structures available
within manufacturing. You also want these assembly and disassembly structure
revisions to be phased in at today's site date + 4 and preserve maintenance
level structure definitions from previous revision.
Purpose: The purpose of this exercise is to prepare VIM template
structure retransfer to Manufacturing by transferring VIM
serial structure template to holding table. This is typically done for a top
template part.
You have revised VIM serial structure template with alternates and
modifications already defined in IFS/Vehicle Information Management. You want to prepare transferring
these structures to manufacturing and creating position parts.
- Open the
Template Part window.
- Query for template part number 11000.
- Right-click and then click Serial Structure Templates Prepared to
Manufacturing.
- On window Serial Structure Templates Prepared
for Manufacturing,
Right-click and then click Prepare Transfer to Manufacturing.
- On
Transfer Options dialog clear the Run In
Background check box. Click OK. This will start retransfer of serial
structure template to holding table.
- Click the Serial Structure Templates
Prepared for
Manufacturing/Temporary Transfer
tab.
- Part No shown on the detailed table is the Position Part No
created during prepare transfer process. The format is following this
formula: Transfer Prefix + Delimiter + Catalog Number (CSN).
Verify that new component position part 06C/723205 is added to template
structure 11000 at structure address 145 on the holding table.
Transfer 11000 Engine structure all levels to your site and phase it in at
today's site date+4 and preserve maintenance level structure definitions
from previous revision by using copy first option.
- Open the
Transfer Template Structure window.
- Query for top template part
number 11000.
- Verify the value of Last Changed and Transfer Prepared Date on the header.
Last Changed is the date of last change on VIM serial structure
template. Transfer Prepared Date is
the date of last transfer from VIM serial structure template to holding table.
- Click the
Transfer Template Structure/Transfer to Site
tab. Verify the value of Date Last Transferred and Last Phase In Date
on your site XX90. These fields show when the last transfer was done and
at what date structure revision is phased in. The Transfer Template Id field is filled with default part
template XXMRO and the New Phase In Date is defaulted to today's site
date.
- Enter today's site date + 4 in New Phase In Date field.
-
Select the Copy First check box.
- Select the row on your site XX90. Right-click on the row, and then
click Transfer to Manufacturing. Click OK to confirm the
transfer.
- Verify the value of Date Last Transferred is today's site date, Last Phase In Date
is today's site date + 4, and proposed
New Phase In Date is today's site date + 5 on your site XX90. The
suggested New Phase In Date is one day after the Last Phase In Date
or the Site Date, whichever is later.
Errors, Warnings and Informational messages are created
when doing a transfer from the holding table to a manufacturing Site. You want
to verify whether transfer was successful or failed, and also if there are
problems on transfer you want to resolve it.
- Open the
Transfer Template Structure window.
- Query for top template part
number 11000.
- Click the
Transfer Template Structure/Template Transfer History
tab.
- Verify that value of Transfer Result is Success . That means there
are no Error on the transfer. However, warnings and information may be logged
during the transfer. You can verify these messages by selecting the row on
your site XX90, right-click on the row, and then click Template Transfer Log.
-
On Template Transfer Log window, verify that there are warning messages
that inform you that new component 06C/723205 is added to structure Assembly
and Disassembly parent 06C/7232 with quantity per assembly of 4. You may
verify this component addition by using right-click on the rows, and then
click Product Structure.
Site |
Transfer Result |
Position Part No |
Transfer Phase In Date |
Transfer Date |
Evaluation Session Id |
XX90 |
Success |
06C/7200 |
today's site date + 4 |
today's site date + 4 |
a unique number |
Verifying Assembly and Disassembly product structures.
- Open the
Product Structure window.
- Query for part
06C/7200 on your site XX90.
- Verify that previous revision is phased
out at today's site date + 3 and new phase in is today's site date + 4.
Verify also that all underneath structure revisions are phased in on proposed
new phase in date and phased out on proposed new phase in date -1.
Verifying maintenance level structure definition.
- Open the
Maintenance Level Structure window.
- Query for part
06C/7200 on your site XX90
- Verify that maintenance level structure
definitions from revision 1 of 06C/7200 are copied to revision no 2.
Verify that your actual installed engineering parts are transferred to your
site.
- Open the
Inventory Parts window.
- Query for
part 11000-3-2-05 and on your site XX90. The actual parts for are
listed.
- Verify the value of Planner is DAMON as defined in engineering site
role setup. The inventory part created for position part is of type
Manufactured.
The actual inventory part records for prime/installed parts:
Site |
Part No |
Part Description |
Inventory U/M |
Planner |
Part Type |
XX90 |
11000-3-2-05 |
Module 3, EMU 2, Part 5 |
PCS |
DAMON |
Manufactured |
The actual inventory part records for alternate parts:
Site |
Part No |
Part Description |
Inventory U/M |
Planner |
Part Type |
XX90 |
11000-90-5 |
Engine 11000, Accy Part |
PCS |
DAMON |
Manufactured |
Add affected part to existing modification definition in
IFS/Vehicle Information Management.
- Open the Affected Parts window.
- Create a new row, and then enter the information shown in the figure
below.
- Save changes.
Modification Code |
Modification Revision |
Modification Part Number |
Affected Part Number |
Affected Part Revision |
100-2 |
1 |
11000-3 |
11000-3-2-05 |
R01 |
Transfer modification separately
- Open the
Transfer Template Structure
- Query for template part number 11000.
- Select the row on your site XX90. Right-click on the row, and then
click Modification Transfer to Manufacturing. Click OK to confirm the
transfer.
- Open the
Modification Repair
Code
window.
- Query for modification code 100-2, part no 11000-3
on your
site.
- Verify that for assigned part 11000-3 affected part 11000-3-2-05 is added.