Use this tab to view and change information about the machine and the labor operations needed to manufacture the parent part for a shop order. You can change existing operations or add new ones. Any additional operations affect only this shop order, not the entire operation list of the parent part. Operations may include machine information, labor information, or both. Labor information requires a labor class, crew size, labor setup time, and manufacturing factor. Both machine and labor information may have associated setup times, manufacturing/labor factors, or both.
If IFS/Purchasing is not installed, the following right mouse button options are unavailable: Report Receipt, Cancel Receipt, Scrap, Credit, Rework, Undo Scrap, Undo Credit, and Undo Rework. Also, without IFS/Purchasing, you cannot add operations with Outside Work Center as the work center code.
Note: Changes to operations cause them to be rescheduled. Rescheduling begins with the selected operation. Once this operation is rescheduled, all subsequent operations (forward scheduling) or previous operations (backwards scheduling) are rescheduled. However, some scheduling changes may depend on previous or subsequent operations. Starting the rescheduling process with an operation that is dependent on a previous or subsequent operation may yield scheduling results that differ from those that would have been generated if you had rescheduled the entire shop order. It is your responsibility to determine whether rescheduling the entire shop order is necessary
Disassemble
overhaul object
Handle repair
shop order
Assemble overhaul
object
BDR for constraint based
scheduling
Reserve components
Issue components
Report operations
Material review
board
Perform quality inspection and handle discrepancies
Handle
inventory discrepancies
Release outside
operation
Add work guideline to
shop order
Add shop order operation
Delete shop order operation
Update routing revision
and/or alternative
Reserve operation linked material
Report shop order operations
Report labor operation
Cancel operation and
scrap report
Cancel labor operation report
Create configuration
Create MRB case
Enter document text