MS Level 1 Part

[About Master Production Schedule Level 1] [About Rules for Master Scheduling Level 1] [About Master Schedule and Rate by Period]

[To Master Scheduling]

Usage

Use this window and its tabs to enter and view parts to be scheduled on level 1 and to study the results of MS on level 1. Components of parts that were planned on level 0 are automatically entered on level 1 during the disaggregation process. Forecast information comes from level 0.You can add other forecasts to these parts on level 1. Forecasts can also be imported from the demand planner or from customer schedules to MS level 1. A part does not need to be a member of a level 0 family to be planned in MS. Parts that do not belong to a level 0 family are entered manually in this window, then processed in the same way as parts that belong to a level 0 family. Master Scheduling considers only company-owned stock.

For the description of each tab in the window, follow the appropriate link: Detail, Forecast Consumption, Rate by Period, Register Forecast, Sub MS Receipts, View by Period, Supply and Demand, Action Messages,

Activity Diagrams

BDR for MS 1
Perform MS level 1

Activities

Update result from level 0
Enter master schedule level 1
Calculate MS level 1 for single part
Evaluate master scheduling level 1 result
Evaluate master scheduling level 1 result using period template
Run MRP for components
Run project MRP for components