Maintaining DOP Plan/Orders—Key Exercises
Basic Data Setup
Purpose: The purpose of this exercise is to simplify the
process of setting up data correctly in order to complete the exercises below.
It includes setting up your own site and copying specified data to that site.
Before continuing with the exercises on this page, complete the lesson linked
below. You need to do this exercise only once to support all Make to Order
exercises in the current database.
Overview
of Make To Order Data lesson
Main Exercises
Purpose: The purpose of this exercise is to adjust the due
dates and quantities on the top level DOP order and, optionally, its supply order after changes have been made to the date
and quantity on the DOP header. You would normally do this if the demand
quantity or the date on which it was due
changed. The propagation of the demand quantity and the date from the header to the top
order is normally followed by a propagation of the change throughout the DOP
structure. This is shown in the next exercise.
Windows:
DOP Header/Detail
DOP Header/Structure
- Create a DOP and a DOP structure or use an existing DOP in the Unreleased
or Netted Status. If you create a new DOP, enter 22-110 in the Part No
field for your site. Enter 2 in the Qty Demand field, and specify a
due date about a week from today.
- After creating the structure, click the
Structure
tab. Note the values in the Revised Qty Due and the Revised Due Date
fields.
- Click the
Detail tab. Change the quantity on the DOP
header and save your change. This will not change the quantity for the
top order on the
Structure tab.
- In the header area, right-click and then click Update Top Level Quantity.
- Re-query the record. Note that this will update the Revised Qty
Due field for the top order shown in the
Structure tab.
- Note also that this will not update the quantities of the component
records in the structure. You must explicitly propagate the quantity
change made in the DOP header and DOP top order. This is shown in the
next exercise.
- Click the
Detail tab.
- Change the Due Date field to be a week later and save your change. This will not change the date on the top order on the
Structure
tab. Note the values in the Revised Due Date and Revised Start Date
fields for the top order shown on the
Structure tab.
- In the header area, right-click and then click Update Top Level Date.
Re-query the record.
- Note that the values in the Revised Due Date and Revised Start Date
fields for
the top order have changed.
- Note also that this will not update the quantities of the component
records in the structure. You must explicitly propagate the date
change made in the DOP header and DOP top order. This is shown in the
next exercise.
- In the header area, right-click and then click
Release All.
- After the background job completes, click the
Detail tab. Change the quantity on the DOP header and save
your change.
- In the header area, right-click and then click
Update Top Level Quantity. A question appears to ask whether the
quantity should be updated on the supply order. Choose Yes.
- On the
Structure tab, right-click in the header
and then click
DOP Order Detail to open the
DOP Order window
displaying your queried top order.
- Click the
Supply tab and then click the
Shop Order
tab. Select the shop order record, right-click and then select Shop Order
Details. Note the lot size
for the shop order.
- Return to the
Detail tab on the DOP header. Change the
existing due date to the day after in the Due Date field and save your
change..
- In the header area, right-click and then click
Update Top Level Date. A question appears to ask whether the date
should be updated on the supply order. Choose Yes.
- Go to the shop order for the top order. Note the
Need Date for the shop order.
Purpose: The purpose of this exercise is to adjust the due dates and quantities on the DOP
orders in the DOP structure and their supply orders after date and/or quantity changes have been made on higher levels
in the DOP structure. When a demand quantity or date is changed in the top
order, you need to adjust the rest of the DOP structure to fulfill the
demand.
Windows:
DOP Header/Structure
DOP Order/Detail
- Create a DOP and a DOP structure or use an existing
DOP in the Unreleased or Netted Status. If you create a new DOP, enter
22-110 in the Part No field for your site. Enter 2 in the Qty
Demand field, and specify a due date about a week from today in the
Due Date field.
- Note the values of the Revised Qty Due field in the records in the
table area of the
Structure tab.
- Click the
Detail tab. Change the quantity
and due date on the DOP
header and save your change. This will not change the quantity or the
revised due date for the
top order on the
Structure tab.
- In the header area, right-click and then click Update Top Level Quantity.
- On the
Structure tab, right-click in the header
and click Propagate
Date/Quantity, and then click Propagate Quantity Upstream.
- This will propagate the quantity change to the component records and their
components all the way through the structure. Verify this by looking
at the values of the Revised Qty Due field in the records in the
table area of the
Structure tab.
- Note the values of the Revised Start Date and Revised Due Date
fields in the records in the table area of the
Structure tab.
- On the
Structure tab, right-click in the header
and click Propagate
Date/Quantity, and then click Propagate Date Upstream.
- This will propagate the date change to the component records and their
components all the way through the structure. Verify this by looking
at the values of the Revised Start Date and Revised Due Date
fields in the records in the table area of the
Structure
tab.
- In the header area, right-click and then click
Release All.
- After the background job completes, click the
Detail tab. Change the quantity and due date on the DOP
header and save your changes.
- On the
Structure tab, right-click in
the header
and click Propagate Date/Quantity, and then click
Propagate Quantity Upstream. A message appears indicating that a
quantity mismatch exists somewhere in the structure and to review the alarms for
more details.
- On the
Structure tab, right-click in
the header
and click Propagate Date/Quantity, and then click
Propagate Date Upstream. A message appears to indicate that a date
mismatch exists somewhere in the structure and to review the alarms for more
details.
- Click the
Alarms tab. There
are several quantity and date alarms. Note the DOP Ids for the alarms.
- Select one of the date alarms, right-click and
click Adjust Date. Note the alarm disappears.
- Select one of the quantity alarms, right-click and
click Adjust Quantity. Note the alarm disappears.
- Go to the shop order for the DOP Id whose alarms
have been removed. Note the Lot Size and Revised Due Date
for the shop order.
Note: If parts have been netted for any of the orders, the number of netted parts has been reduced if the new order quantity
is lower than the number of parts previously netted to the DOP order.
Note: You can propagate these changes in various windows
and tabs, where DOP orders are displayed.
Purpose: The purpose of the next four
exercises is to show how DOP structures can be modified in
different ways, by adding DOP orders, removing DOP orders, changing routing
operations, and changing the
quantity relationships between the structure levels before the DOP orders are released. DOP allows
flexibility when creating DOP structures so that minor engineering changes can be
made. In this exercise, you will add a DOP order and create a structure below
it.
Windows:
DOP Header/Structure
DOP Order/Components
- Create a DOP and a DOP structure or use an existing
DOP in the Unreleased or Netted Status. If you create a new DOP, enter
22-110 in the Part No field for your site. Enter 2 in the Qty Demand field,
and specify a due date about a week from today.
- Add a new DOP order by creating a new record in the table on the
DOP Header/Structure
tab or the
DOP Order/Components tab.
- In the Part No field, select the part 22-260 from the List of
Values. Set the quantity per assembly to 1.
Note: If you specify a quantity per assembly, the revised quantity
due will be calculated based on the parent quantity and the quantity
per assembly. You can manually override this calculated quantity due.
- In the DOP order line, set the Create Pegged field to Pegged Orders. For purchased
parts, this will create a purchase requisition when you release the order.
For manufactured parts such as this, this setting will allow you to create a structure
for the new DOP order.
- Save the new DOP order.
- The DOP order is now in the Created status. Right-click and then click Plan to change the status to Unreleased.
- Select the new DOP order, right-click and then click DOP Order
Detail to open the
DOP Order window.
- In the header area of the
DOP Order window, right-click and
click Change DOP
Structure, and then click Change Revision and/or Alternative to open
the Create DOP Structure/Routings
dialog box.Click OK
to accept the default revisions and alternatives.
Note that the Structure Changed and the Routing Changed check boxes
are now selected.
- Click the
Components tab to verify that the structure has
been created.
- Click the
Operations tab to verify that the routing has
been created.
Purpose: The purpose of this exercise is to show another way that DOP structures are changed,
by removing unneeded DOP orders from the
DOP structure. For example, one or more unreleased DOP orders may not be needed
if you are changing the structure in some way.
Windows:
DOP Header/Structure
DOP Order/Components
- Before a DOP order can be removed, it must be in a Canceled status.
- Create a DOP structure for part 22-110 or use the DOP from above.
- In the DOP Header window, click the
Structure
tab.
- Select the DOP order for part 22-250, right-click and then click Cancel.
- Click Remove on the toolbar to delete the DOP order from the DOP structure.
- Save your changes.
- Note that in the
Detail tab, the Structure Changed check
box will be selected. You may have to re-query the record to see this change.
Note: Alternatively, right-click and then click Remove
Specific Branch(es). This removes the order
and all its descendents without having to first cancel each order.
Purpose: The purpose of this exercise is to show another way that DOP structures are changed,
by changing or removing DOP routings.
This might be done, for example, because you want to use updated routings or if no routings
are needed.
Windows:
DOP Order/Detail
DOP Order/Operations
Note: Routings are normally found only on DOP orders with the
Create Pegged field
set to Pegged Orders.
- The routing on one of the unreleased DOP orders needs to be changed.
- In the
DOP Order window, query the above DOP ID and Part
No 22-110.
- Note the operations listed in the
Operations tab.
- In
the
Detail tab, note the Routing Revision/Alternative.
- Right-click and then click Change Routing Revision and/or Alternative.
- Select the desired routing revision and alternative from the List of
Values.
- Verify that the routing revision and alternative are changed on the
Detail
tab. Also verify that the operations listed in the
Operations tab have been
replaced.
- Note that the Routing Changed check box for the DOP order is now
selected.
- You can also remove routings. Using the same order, right-click and then
click Remove Routing.
- Verify that the routing revision and alternative values are removed from the
Detail tab. Also verify that the operations listed in the
Operations tab have
been removed.
Note: The Routing Changed check box will also be
selected when routings are removed.
Purpose: The purpose of this exercise is to show another way
of changing DOP structures,
by changing the quantity relationships
between the structure levels.
Windows:
DOP Header/Structure
DOP Order/Components
- In the DOP Header window, query
for the above DOP.
- On the
Structure tab, find the DOP order for the part 22-320 and change the quantity per assembly
from 2 to 1.
- Save your changes.
- Note that the revised quantity due will be recalculated based on your
changes.
- Using the same DOP order, change either of the scrapping factors: Component
Scrap or Shrinkage Fac.
What happens to the revised quantity due?
Note: The scrapping algorithm is as follows:
Component quantity required = ((parent quantity * quantity per assembly) / (1 - (shrinkage factor / 100))) + component scrap
Note that the Structure Changed check box for the parent DOP order
is now selected.
Purpose: The purpose of the next four
exercises is to show how DOP structures can be modified in
different ways—adding DOP orders, removing DOP orders, changing routing
operations, and changing the
quantity relationships between structure levels after DOP orders are released. DOP allows for
flexibility when maintaining DOP structures so that minor engineering changes can be
made. In this exercise, you will add a DOP order and create a structure below
it.
Windows:
DOP Header/Structure
DOP Order/Components
- Create a DOP and a DOP structure or use an existing
DOP in the Unreleased or Netted Status. If you create a new DOP, enter
22-110 in the Part No field for your site. Enter 2 in the Qty
Demand field, and specify a due date about a week from today in the
Due Date field.
- Release the DOP header and wait for the background
job to finish.
- Add a new DOP order by creating a new record in the table area of the
DOP Header/Structure
tab or
DOP Order/Components tab.
- In the Part No field, select the part 22-260 from the List of
Values. Set the quantity per assembly to 1.
Note: If you specify a quantity per assembly, the revised quantity
due will be calculated based on the parent quantity and the quantity
per assembly. You can manually override this calculated quantity due.
- In the DOP order line, set the Create Pegged field to Pegged Orders. For purchased
parts, this will create a purchase requisition when you release the order.
For manufactured parts such as this, this setting will allow you to create a structure
for the new DOP order.
- Save the new DOP order. A message displays to
indicate the pegged supply order(s) have been updated.
- Select the new DOP order, right-click and then click DOP Order
Detail to open the
DOP Order window. The DOP order
is in released status.
- Click the
Supply tab. Note there
is a supply shop order created for the DOP order.
- Close the DOP Order window.
- In the
Structure tab, right-click
and click DOP Order Detail to open the
DOP Order window
for part 22-110.
- Click the
Supply tab, highlight the
supply order, right-click and click Go To Supply to open the
Shop Order window.
- Click the
Material tab. Note part
22-260 is added.
- In the header portion, right-click and click
Release to make the status of the shop order released.
- In the header portion, right-click and click
Report to open the
Report Shop Order Operation window.
Highlight operation 10, right-click and click Report Time.
- Return to the the
Structure tab of
the DOP Header window.
- Add a new DOP order for part 22-260 from the List
of Values. Set the quantity per assembly to 1.
- Save the new DOP order. A message displays
to indicate it is not possible to change the structure when a DOP order is
started.
Purpose: The purpose of this exercise is to show another way that DOP structures are changed,
by removing unneeded DOP orders from the
DOP structure which is released. For example, one or more released DOP orders may not be needed
if you are changing the structure in some way.
Windows:
DOP Header/Structure
DOP Order/Components
- Before a DOP order can be removed, it must be in a Canceled status.
- Create a DOP structure for part 22-110.
- Release the DOP header and wait for the background
job to finish.
- In the DOP Header window, click the
Structure
tab.
- Select the DOP order for part 22-250, right-click and then click Cancel.
- Click Remove on the toolbar to delete the DOP order from the DOP structure.
- Save your changes. A message displays to indicate
the pegged supply order(s) have been updated.
- In the
Structure tab, right-click and
click DOP Order Detail to open the
DOP Order window for
part 22-110.
- Click the
Supply tab, highlight the
supply order, right-click and click Go To Supply to open the
Shop Order window.
- Click the
Material tab. Note part
22-250 is removed.
- In the header portion, right-click and click
Release to make the status of the shop order released.
- In the header portion, right-click and click
Report to open the
Report Shop Order Operation window.
Highlight operation 10, right-click and click Report Time.
- Return to the the
Structure tab of
the DOP Header window.
- Select the DOP order for part 22-230, right-click and then click Cancel.
- Click Remove on the toolbar to delete the DOP
order from the DOP structure.
- Save your changes. A message displays to indicate
it is not possible to remove a component due to the status of the pegged
orders.
Note: Alternatively, right-click and then click Remove
Specific Branch(es). This removes the order
and all its descendents without having to first cancel each order. This is
allowed when there are no supply orders which have reached a started status.
Purpose: The purpose of this exercise is to show another way that DOP structures are changed,
by changing or removing DOP routings for a DOP Order which is released.
This might be done, for example, because you want to use updated routings or if no routings
are needed.
Windows:
DOP Order/Detail
DOP Order/Operations
Note: Routings are normally found only on DOP orders with the
Create Pegged field
set to Pegged Orders.
- Create a DOP structure for part 22-110.
- Release the DOP header and wait for the background
job to finish.
- In the
Structure tab, right-click and
click DOP Order Detail to open the
DOP Order window for
part 22-110.
- Note the operations listed in the
Operations tab.
- In
the
Detail tab, note the Routing Revision/Alternative.
- Right-click and then click Change Routing Revision and/or Alternative.
- Select the desired routing revision and alternative from the List of
Values.
A message displays to indicate the DOP order and Pegged orders have been
updated.
- Verify that the routing revision and alternative are changed on the
Detail
tab. Also verify that the operations listed in the
Operations tab have been
replaced. Verify the operations for the supply shop order are changed.
- Note that the Routing Changed check box for the DOP order is now
selected.
- You can also remove routings. Using the same order, right-click and then
click Remove Routing.
- Verify that the routing revision and alternative values are removed from the
Detail tab. Also verify that the operations listed in the
Operations tab have
been removed. Verify the operations for the supply shop order are
removed.
- In the
Detail tab of the
DOP
Order window, right-click and then click Change Routing
Revision and/or Alternative. Select the desired routing and
alternative to restore the routing operations for the DOP order and its
supply shop.
- Go to the pegged shop order and report time for
one its operations.
- In the
Detail tab of the
DOP
Order window, right-click and then click Change Routing Revision
and/or Alternative. A message displays to indicate it is not
possible to change the Structure/Routing due to the status of the pegged
orders.
Note: The Routing Changed check box will also be
selected when routings are removed.
Purpose: The purpose of this exercise is to show you another way
of changing DOP structures,
by changing the quantity relationships
between the structure levels, when the DOP structure is released.
Windows:
DOP Header/Structure
DOP Order/Components
- Create a DOP structure for the part 22-110.
- Release the DOP header and wait for the background
job to finish.
- On the
Structure tab, find the DOP order for the part 22-320 and change the quantity per assembly
from 2 to 1. Save your changes. A message appears indicating that the pegged
order is updated. The pegged shop order status must be the same or less than
the status defined for the shop order update flag on the DOP order.
- Verify that the pegged order is updated.
- Go to the pegged shop order and report time for
one of its operations.
- On the
Structure tab, find the DOP order for the part 22-320 and change the quantity per assembly
from 1 to 2. Save your changes. A message appears indicating that it is not
possible to change the component quantity due to the status of the pegged
order.
Purpose: The purpose of this
exercise is to replicate the date and quantity changes between a customer order and
a DOP header. You have to change the date or the quantity on a customer order
after it has been released, if the customer requests a change. You have to
change the date or quantity for a DOP header if there is a production problem.
Windows:
Customer Order
DOP Header
- Create a customer order for the part 22-110, for a quantity of 10, which
is due about a
week from today. Release the customer order to create the DOP header.
- Create the DOP structure for the DOP header.
- For the customer order, change the quantity from
10 to 20, and change the date from one week from today to two weeks from
today. Save the changes. A message appears inquiring
whether the
changes should be replicated. Click Yes.
- Query again for the DOP header and verify that the date and
quantity have been changed. Click the
Alarms tab and verify
that there are two alarms created for the difference between the date quantity of
the top DOP order and the DOP Header. In order to resolve the alarms,
use the Update Top Level Date and Update Top Level Quantity
options. Note that the Propagate Date Upstream and Propagate Quantity
Upstream options must be used to apply the changes to the
remaining DOP orders.
- Create a new customer order for the part 22-110, for a
quantity of 10, which is due about a week from today. Release the customer order to
create the DOP header.
- Create the DOP structure and release the DOP
header.
- For the customer order, change the quantity from
10 to 15, and change the date from one week from today to two weeks from
today. Save the changes. A message appears inquiring
whether the changes
should be replicated. Click Yes
- Query again for the DOP header and verify that the date and
quantity have been changed. Use the Update Top Level Date and
Update Top Level Quantity options to update the top level DOP order.
A message appears inquiring whether you want to apply the changes to the
pegged shop order. Click Yes.
Use the Propagate Date Upstream and Propagate
Quantity Upstream options to update the remaining DOP orders.
- Click
on the
Alarms tab to see
the existing alarms. Resolve each alarm by using the Adjust Date and
Adjust Quantity options to update the pegged orders.
- Create a new customer order for the part 22-110, for a
quantity of 5, which is due about a week from today. Release the customer order
to create the DOP header. Create the DOP structure.
- For the customer order, change the quantity from 5
to 10, and change the date from one week from today to two weeks from today.
Save the changes and do not replicate the changes.
- Query again for the DOP header and verify that the date and
quantity of the DOP header is unchanged. Click the
Alarms tab
to verify that two alarms exist.
- For the DOP header, change the quantity from 5 to
11, and the date from one week from today to three weeks from today.
Save the changes and replicate the changes.
- Query again for the customer order and verify that the
quantity and planned due date have been changed.
Purpose: The purpose of this
exercise is to change the date and quantity for a pegged order and replicate the
change to a DOP order. You might do this if there was a problem with a purchase
order or a shop order.
Windows:
DOP Order
Shop Order
- Create a DOP structure for part 22-110, quantity of
1, a due date of one week from today. Release the DOP structure.
- For the pegged shop order of the top DOP order,
change its lot size from 1 to 2, and the need date from one week from today
to two weeks from today.. Save the changes. A question appears
to ask whether to replicate the change to the DOP order. Respond with Yes.
Another question appears to ask whether to replicate the changes for the
pegged orders of the materials which are DOP parts. Respond with
Yes.
Note: You have the option to replicate a date or
quantity change from a pegged purchase requisition or pegged purchase order to a
DOP order.
- Re-query the DOP header. Click the Tree Structure
tab to verify the quantity and revised due date of the DOP orders for parts,
22-110, 22-210 and 22-240 are changed.
Note: When you choose to not replicate changes
between pegged orders and DOP orders, the system creates date and quantity
alarms automatically.
Purpose: The purpose of this
exercise is to split and merge a shop order pegged to a DOP order. You might do
this when production changes are necessary.
Windows:
DOP Order
Shop Order
- In the
Shop Order window, query the
shop order for the top DOP order in the previous exercise.
- In the header portion of the
Shop Order
window, right-click and click Merges and Splits and click
Split Shop Order. Split the shop order in half.
- In the
DOP Order window, re-query
the DOP order. Click the
Supply tab and click the
Shop Order tab. There are two shop orders pegged to the DOP order.
Note the shop order numbers.
- Open the
Shop Order window for the
new shop order. Right-click and click Merges and Splits and click
Merge into Shop Order. From the List of Values, choose the original shop
order.
- In the
DOP Order window, re-query
the DOP order. Click the
Supply tab and click the
Shop Order tab. There is one shop order pegged to the DOP
order.
Purpose: The purpose of this exercise is to unpeg or
remove the connection between a DOP and a customer order. You would do
this, for example, if the customer canceled the order or you want to peg another DOP to the
customer order.
Windows:
Customer Order
DOP Header
- Create a customer order for the part 22-110, for a quantity of 10, which
is due about a
week from today. If there is no value in the Order Type
field, enter NO or select this value from the List of Values. Release the customer order to create the DOP header.
Refer to the the Creating DOP Headers from Customer Orders with Automatic DOP
lesson to learn how to do this..
- At the end of the above lesson, you should have the
DOP Header
window open, displaying the queried DOP.
- On the
Demand tab, select the record for the customer order.
This is the record which pegs the customer order to the DOP. Note the customer order number ________.
- Right-click and then click Unpeg. This will remove the record
which links the DOP and customer order. The two will no longer be linked.
- Now that the DOP is not linked to fulfill the customer order, it could be
used to fulfill another customer order demand or if nothing has been done
yet with the DOP, i.e., it is not released, it could be canceled.
- As an optional exercise, link the customer order to the DOP again.
- On the
Demand tab, create a new record. Select the customer order that you just
unpegged from the List of Values. Save the record.
Note: More than one DOP can be used to supply a customer
order. Additionally, more than one customer order can be supplied by a DOP.
Purpose: The purpose of this exercise is to unpeg or
remove the connection between a DOP and an associated supply order. The
supply order can be a shop order, a purchase requisition, or a purchase order. You
can do this if there is a problem with the supply order, or if
you want to create a different supply order because the DOP changed in some way.
Windows:
DOP Header
DOP Order
- Create a DOP header for the part 22-110, for a quantity of 10, which is due about one week
from today. Create the DOP structure and release it to create the
supply orders.
Refer to the the Releasing All DOP Orders At Once lesson to learn how to do this.
- At the end of the above lesson, you should have the
DOP Header
window open, displaying the queried DOP.
- On the
Structure tab, right-click in the header area
and then click
DOP Order Detail to open the
DOP Order window
with your queried top order.
- Click the
Supply tab and then click the
Shop Order
tab. Select the shop order record, right-click and then click Unpeg.
This will remove the record which links the DOP and shop order. The
two will no longer be linked.
- As an optional exercise, create a new pegged shop order for this DOP
order.
- In the header area, right-click and then click Create Pegged Order. This will create a new pegged shop order to fulfill this DOP
order. You will need to query again for the DOP to see this record on the
Supply tab.
Purpose:
The purpose of this exercise is to unpeg
all the supply orders in a DOP structure at one once. You can do this if there are problems with the supply orders or if
you want to create a different set of supply orders because the DOP has changed in some way.
Windows:
DOP Header
DOP Order
- Create a DOP header for the part 22-110, for a quantity of 10, which is due about one week
from today. Create the DOP structure and release it to create the
supply orders.
- In the header portion of the
DOP Header
window, right-click and then click Unpeg All. A message appears
indicating that all the supply orders will be unpegged.
Note: You can use the Unpeg Branch option
to unpeg all the supply orders within a branch of a DOP structure.
- Click the
Tree Structure tab to verify that there are no supply orders for the DOP orders.
Note: At this point, you need to create
new supply orders for each DOP order, one at a time.
- Create a new DOP header for the part 22-110, for a
quantity of 2, which is due about one week from today. Create the DOP structure and
release it to create the supply orders. For one of the pegged shop
orders, report time for one or more of its operations.
- In the header portion of the
DOP Header
window, right-click and then click Unpeg All. A message appears
indicating that it is not possible to unpeg due to the status of one of the DOP
orders.
Purpose: The purpose of this exercise is to peg
an existing supply order to a DOP order. You can do this if there are open
non-pegged shop orders for a part, or if you unpeg a supply order and want to
re-peg it to a DOP order.
Windows:
DOP Header
DOP Order
- Create a DOP header for the part 22-110, for a quantity of 10, which is due about one week
from today. Create the DOP structure and release it to create the
supply orders.
- Right-click on the
Tree Structure tab.
Click on the DOP order for the part 22-240, right-click and then click DOP Order
Detail.
- In the header portion, right-click and then click
Manual Pegging.
- In the
Manual Pegging of DOP Order
window, click the
Shop Order tab. For one of the available
shop orders, set the peg quantity to 1. Save your changes.
- In the
Dop Order window, click the
Supply tab and then click the
Shop Order tab. The
pegged shop order exists as a supply order to the DOP order.
- In the header area, right-click and click
Branch and then click Release Branch.
- After the DOP order is released, click the
Supply tab and then click the
Shop Order tab. The DOP order
has a new supply shop order with a quantity of 9.
- Select this supply order, right-click and then click
Unpeg.
- In the header area, right-click and then click
Manual Pegging.
- On the
Shop Order tab, set the peg quantity to 9 for the shop order which was unpegged. Save your changes.
Verify that this shop order is a supply order to the DOP order.
Note: You can manually peg or re-peg a purchase
order to a DOP order for a part which is purchased.
Purpose: The purpose of this exercise is to create a
supply purchase order for a DOP order with a manufactured part. You can
do this if there were production problems for a part and it could be
purchased from a supplier.
Windows:
DOP Header
DOP Order
- Before you can proceed with this exercise, create a purchase part record and
a supplier for purchase part record for the part 22-210.
- In the DOP Header window, (in which the DOP header was created in the
previous exercise), click the Tree Structure tab.
Click on the DOP order for the part 22-210, right-click
and then click DOP Order Detail.
- In the header area, right-click and click
Branch, and then click Release Branch.
- After the DOP order is released, click the
Supply tab and then click the
Shop Order tab.
- Highlight the supply order, right-click and then click
Unpeg.
- Click the
Purchase Order tab. In the
table area of the window, right-click and then click Create New Pegged
Order. A message appears inquiring whether you want to create a purchase
order. Click Yes.
Note: You can create a new pegged shop order for
a DOP order with a purchased part. In order to do this, it is necessary to
have a manufacturing structure and a routing defined for the purchased part.
Cancel Customer Order or DOP Header
Purpose: The purpose of this exercise is to
cancel a customer order, a DOP structure, and all its supply orders. You can do this if
a customer cancelled a customer order which was released.
Windows:
Customer Order
DOP Header
- Create a customer order for the part 22-110, for a quantity of 10, which
is due about a
week from today. Release the customer order to create the DOP header.
- Create the DOP structure for the DOP header.
- In the
Customer Order window, cancel
the customer order line. Select a cancellation reason from the List of
Values. A message appears indicating
whether the changes should be
replicated. Click Yes.
Note: When you choose not to replicate the
change, the customer order is cancelled and the DOP header is unpegged from the
customer order line.
- In the DOP header window, verify that the
DOP header is Cancelled. Click the
Structure Multilevel
tab to verify that all the DOP orders have been cancelled.
- Create another customer order for the part 22-110, for
a quantity of 5, which is due about a week from today. Release the customer
order to create the DOP header.
- Create the DOP structure for the DOP header.
Release the DOP header to create the supply orders.
- In the
Customer Order window, cancel
the customer order line. Select a cancellation reason and replicate
the changes.
- In the DOP Header window, click the
Tree Structure tab to verify that the DOP orders have been cancelled and
no supply orders exist.
Note: Canceling a DOP header which is not
connected to a customer order cancels all the DOP orders and removes all the supply
orders.
- Create another customer order for the part 22-110, for a
quantity of 3, which is due about a week from today. Release the customer order
to create the DOP header.
- Create the DOP structure for the DOP header.
Release the DOP header to create the supply orders.
- For one of the shop orders, report time for one or
more of its operations.
- In the
Customer Order window, cancel
the customer order line. Select a cancellation reason and replicate the
changes. A message appears indicating that a pegged order has a status
which does not allow updates. In order to cancel the customer order
line, unpeg the DOP header from the customer order line.
- In the DOP Header window,
right-click in the header area and then click Cancel. A message
appears inquiring whether you want to cancel the DOP header and all the DOP
orders in the structure. Click Yes.Then a message appears indicating that the customer order line must be
cancelled or the DOP header must be unpegged before the cancellation is done.
Auto Close DOP Orders and DOP Header
Purpose: The purpose of this exercise is to
have the system automatically close DOP orders and the DOP header. You would do
this to minimize the need to close each DOP order manually.
Windows:
Site
DOP Header
- In the
Site window, check the DOP
Auto Close parameter for your site.
- For one of the existing DOP headers connected to a
customer order line, reserve, issue, report and receive the shop orders for
parts 22-210 and 22-240. Reserve the shop order for part 22-210.
- In the DOP Header window, click the
Tree Structure tab. Verify the DOP orders for parts,
22-210 and 22-240, and their component DOP orders are closed.
- Complete the shop order for part 22-210.
- In the Dop Header window, verify the
DOP header and all the DOP orders are closed.