It is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Purpose: The purpose of this exercise is to create the required data that is used in the master production scheduling exercises. This sets up data for your site, which only needs to be done once, for master production scheduling.
If you have already set up the master production scheduling data on your site, use that data instead.
Note: Parts with planning method O and T are not required.
General exercise for Master Production Scheduling Planning Data Overview
Purpose: The purpose of this exercise is to create the required data that is used in the master production scheduling exercises. This sets up data for your site, which only needs to be done once, for master production scheduling.
If you have already set up the master production scheduling data on your site, use that data instead.
Windows:
Schedule
General exercise for Create a Work Time Calendar
Purpose: The purpose of this exercise is to ensure that the period template, representing your material planning needs, exists on your site.
Windows:
Period Template Maintenance
Period No |
Period Length |
Plan Period Unit |
1 | 1 | Day |
2 | 1 | Day |
3 | 1 | Day |
4 | 1 | Day |
5 | 1 | Day |
6 | 1 | Week |
7 | 1 | Week |
8 | 1 | Week |
9 | 1 | Month |
10 | 1 | Month |
General exercise for Period Templates
Purpose: The purpose of this exercise is to verify that the MS sets 0 and 1 are available for use for these exercises.
Windows:
MS Basic Data
/Master Schedule Set
MS Set |
MS Set Description |
0 | Base plan |
1 | Planning table for MRP and CRP |
General exercise for Creating MS Sets
Purpose: The purpose of this exercise is to manually calculate an MS schedule for a level 1 part.
Windows:
Calculate MS Level 1
Background Jobs
MS Level 1 Part
MS Level 1 Part
/Register Forecast
Forecast Date | Master Schedule |
Period 3 | 32 |
Period 4 | 35 |
Period 5 | 35 |
Period 6 | 35 |
Period 7 | 70 |
Purpose: The purpose of this exercise is to override the MS level 1 calculated scheduled receipts with manually entered fixed scheduled receipts.
Windows:
MS for Multiple Parts
Period No | Fixed Receipt |
Period 3 | 40 |
Period 4 | 35 |
Period 5 | 35 |
Period 6 | 175 |
Period 7 | 3 |
Purpose: The purpose of this exercise is to recalculate an MS schedule for a level 1 part that has had fixed scheduled receipts entered to override previously calculated scheduled receipts.
Windows:
Calculate MS Level 1
Background Jobs
MS Level 1 Part
MS Level 1 Part
/Receipts
Forecast Date | Master Schedule |
Period 3 | 40 |
Period 4 | 35 |
Period 5 | 35 |
Period 6 day 1 | 35 |
Period 6 day 2 | 35 |
Period 6 day 3 | 35 |
Period 6 day 4 | 35 |
Period 6 day 5 | 35 |
Period 7 day 1 | 1 |
Period 7 day 2 | 1 |
Period 7 day 3 | 0 |
Period 7 day 4 | 1 |
Period 7 day 5 | 0 |