Performing Level 1 Master Production Scheduling—Key Exercises
IMPORTANT |
It is extremely important
that you set up and work within your own site to maintain your
data integrity. If you work within any other site, you will
compromise your own exercise data as well as the data of other
students. Predictable exercise results require that your data
be isolated in your own site. |
Basic Data Setup
Overview of Master Production Scheduling Data
Purpose: The purpose of this exercise is to create the required data that is
used in the master production scheduling exercises. This sets up data for your
site that only needs to be done once for master production scheduling.
If you have already set up the master production scheduling data on your
site, use that data instead.
Note: If
using only level 1 and MRP parts, parts with planning methods O and T are not required.
- Set up your site for master production scheduling planning data for racing
engines.
General exercise for Master Production Scheduling
Planning Data Overview
MS Sets 2 through 6
Purpose: The purpose of this exercise is to verify that MS sets
2 through 6 are available for use with Sales and Operations forecast planning of these exercises.
Windows:
MS Basic Data
/Master Schedule Set
- Open the MS Basic Data window and click
the
Master Schedule Set tab.
- Populate the window.
- Verify that the following MS sets exist:
MS Set
|
MS Set Description |
0 |
Base plan |
1 |
Planning table for MRP and CRP |
2 |
Sales and operations plan |
3 |
Aggregated demand |
4 |
Proposed total forecast |
5 |
Eastern region forecast |
6 |
Western region forecast |
General exercise for Creating MS Sets
Main Exercises
Purpose: The purpose of this exercise is to manually calculate an MS
schedule for a level 1 part.
Windows:
Calculate MS Level 1
Background Jobs
MS Level 1 Part
MS Level 1 Part
/Register Forecast
- Open the Calculate MS Level 1 window.
- Enter MS set 1, your site, and part 24-104.
- Verify that the run date is today's date.
- Click OK.
- Open the
Background Jobs window.
- Populate the window.
- Verify that the state for the
Level 1 Master Scheduling background job is Ready.
- Open the
MS Level 1 Part window.
- Query for part 24-104 at your site.
- Click the
Register Forecast tab.
- Verify that the value in the Last
Run Date field is today's date and that the Master
Schedule column following values appear in the :
Forecast Date |
Master Schedule |
(For the period 3) |
32 |
(For the period 4) |
35 |
(For the period 5) |
35 |
(For the period 6) |
35 |
(For the period 7) |
70 |
Purpose: The purpose of this exercise is to automatically schedule an
MS batch job to calculate a level 1 part.
Windows:
Calculate MS Level 1
- Open the Calculate MS
Level 1
dialog.
- Click the Schedule button, it will open the New
Database Task Schedule window
- Enter scheduling parameters.
- Verify that the job you just scheduled is displayed in the
Scheduled Database Tasks
window.
Purpose: The purpose of this exercise is to review disaggregated results in the
level 1 part in table and graphical formats, and in action proposals
format.
Windows:
MS Level 1 Part
MS Level 1 Part
/Register Forecast
MS Level 1 Part
/Action Messages
Detailed MS Graph
Cumulative MS Graph
MS Action Proposals
Shop Order Requisitions
Table Format:
- Open the
MS Level
1 Part window.
- Query for part 24-104 at
your site.
- In the header, review level 1 settings, which were inherited from the
level 0 part.
- Click the
Register Forecast tab for MS set 1.
- Verify the total value in the Forecast 0 column is 206.5.
- Click the Action Messages tab for
MS set 1.
- Verify that the the Message Description field displays Negative Projected Available.
Graphical Detailed Format:
- Open the Detailed MS Graph window.
- Click MS
level One, part 24-104,
your site, and MS set 1.
- If not using level 0 MPS, right-click in the header, click Recalculate
Template, and then click OK. Note: This synchronizes the graph
start date with the period template start date.
- In the header, right-click and then click Show Graph.
- Change the end period number to 12.
- Click OK and view detailed results.
Graphical Cumulative Format:
- Open the Cumulative MS Graph
window.
- Click MS level One, part 24-104,
your site, and MS set 1.
- In the header, right-click and then click Show Graph.
- Change the end period number to 12.
- Click OK and view cumulative results.
Action Proposals Per Planner:
- Open the MS Action Proposals window.
- Query for your site.
- Verify that the Message field for part 24-104 displays Negative
Projected Available.
Purpose: The purpose of this exercise is to simulate the transition of
elapsed time in order to activate the crossing of the PTF calculations.
Windows:
MS Level 1 Part
MS Level 1 Part
/Register Forecast
Shop Order Requisitions
Perform MRP
Note: This exercise is only performed for this class and once during initial system setup.
- Open the
MS Level
1 Part window.
- Query for part 24-104 at your site.
- In the Demand Time Fence field, enter 3.
- In the Planning Time Fence field, enter 7.
- Save the changes.
- In the header, right-click and click Run MS—One Part.
- Verify part 24-104 and MS set 1, and then click OK.
- Click the
Register Forecast tab.
- Verify that Fixed is displayed in the Proposed column for periods
3, 4, and 5.
- Open the Shop Order Requisitions window.
- Query for part 24-104 at your site.
- Verify that
the shop order requisitions have been created for part 24-104.
Purpose: The purpose of this exercise is to aggregate a level 1 part
and create an S&OP.
Windows:
Aggregate Level 1 to Level 0
Background Jobs
Aggregate Inventory Transactions per Period
Sales and Operations Planning
- Open the Aggregate Level 1 to Level 0 window.
- Verify that the Source Item Plan MS set is 1.
- Enter your site, part 24-000, and MS set 3 under Target Family Plan.
- Click OK.
- Open the
Background Jobs window.
- Populate the window.
- Verify that the state for the Level 1
Item Plan Aggregation background job is Ready.
- Open the
Aggregate Inventory
Transactions per Period window.
- Verify that your site is displayed.
- Click OK.
- Open the
Background Jobs window.
- Populate the window.
- Verify that the state for the Aggregate Inventory Transactions per Period
job is Ready.
- Open the
Sales and Operations Planning window.
- Verify that your site is used, and then enter 3 in the MS Set field.
- Click OK.
- Click Yes in the confirmation prompt.
- Verify that the following results are displayed:
Field |
Value |
Description |
Annual (Base) Sales Plan |
295 |
Sum of part totals in the Level 0 MS Set 0 column for company
10. |
Current Sales Plan |
295 |
Sum of part totals in the Level 0 MS Set 1 column for company
10. |
Proposed Sales Plan |
263.5 |
Sum of part totals in the Aggregated Demand column of Level 0 MS
set 3 parts for company 10. |
Proposed Production Plan |
175 |
Sum of part totals in the Supply column of Level 0 MS
set 3 parts for company 10. |
Purpose: The purpose of this exercise is to review MS level 0 results in table and graphical formats.
Windows:
MS Level 0 Part
MS Level 0 Part
/Register Forecast
MS Level 0 Part
/Action Proposals
Detailed MS Graph
Cumulative MS Graph
Table format:
- Open the MS Level 0 Part window.
- Query for part 24-000 at your site.
- Click the
Register Forecast tab for MS set 1.
- Verify that the the last run date is equal to today's date, and that the
values in both the Available To Promise and Cumulative Available fields
is 0.
Graphical format:
- Open the Detailed MS Graph
window.
- Click MS
level Zero, part 24-000, your site, and MS set 1.
- In the header, right-click and then click Recalculate Template. This synchronizes the graph start date with the period template
start date.
- Click OK.
- In the header, right-click and then click Show Graph.
- In the End No field, change the number to 12.
- Click OK and view graphical results.
Cumulative format:
- Open the Cumulative MS Graph
window.
- Click MS
level Zero, part 24-000, your site, and MS set 1.
- In the header, right-click and then click Show Graph.
- In the End Period No field, change the number to 12.
- Click OK and view cumulative results.