Create Control Chart

Explanation

Use this activity to create a control chart for a specific control plan line.

When creating  Xbar and R chart, Xbar and S chart, np chart, and c chart, the defined sample size and resulting sample size will be used.

An analysis will not be included in creating a chart if any of the following conditions exist.:

 

Prerequisites

System Effects

As a result of this activity, a control chart for a specific control plan line is created depending on the sample size.

Window

Control Plan - Manufacturing
Control Plan - Purchasing
Control Plan - Inventory
Xbar and R chart, Xbar and S chart,
p chart, c chart, u chart
, np chart

Related Window Descriptions

Control Plan - Manufacturing
Control Plan - Purchasing 
Control Plan - Inventory

Xbar and R chart, Xbar and S chart
p chart, u chart, c chart, np chart
Not included sample data- Attribute
Not included sample data- Variable

Procedure

  1. Select the control plan line.
  2. Right-click and then click Create SPC Chart.
  3. Specify a time period by selecting the dates in the From and To fields under the Analysis Date group box.
  4. Click OK to continue.
  5. Click OK to view the created control chart immediately, or No to view it later.
  6. If you want to view the analysis numbers that were excluded when the control charts were created, right-click and then click Not Included Sample Data.