This activity is used to verify the calculated task dates as to when deferred faults are run after they have been approved. You can also use this activity to adjust the execution time of the background job (For more information, refer the online help file: Using Background Jobs). At installation, the server process for due calculations for deferred faults is set (by default) to execute each day at 8:00 P.M. The background job can also be executed manually for a specific fault.
As a result of this activity, the task date value is calculated and the fault is deferred.
Serial Operational Information
Serial Operational
Information/Fault/Additional
Deferral
Definition
Operations and Fault Basic Data/User Auth. Deferrals
Open Deferred Faults
Follow this procedure to verify calculated task dates: