Use this tab window to view the results after a resource capacity calculation. The result is split into workdays (defined by the calendar) for each activity and each resource group. For each day, the load hours are estimated. An activity that is partly outside the capacity resource periods will distribute its load hours only in the period that the resource group is available. If the activity is totally outside the resource group periods, the load will be distributed evenly over the activity period.
Forecast
and Assign Resources
Plan
and Assign Resources