This activity is used to set up a scheduled task to deactivate Send Data for Scheduling schedule tasks as well as to deactivating an entire Dataset in Mobile Workforce Management. There are specific parameters that need to be defined before the task can be executed as a background job. The scheduled task for deactivating a dataset will have the following parameters:
Parameter | Description |
Dataset ID | The identity of the dataset that should be deactivated or for which schedule tasks should be deactivated. '%' can be entered if all datasets should be deactivated. |
Deactivate Dataset | Determines if the specified dataset should be deactivated. If the checkbox is selected, the dataset will be deactivated and all broadcasts for the defined dataset will be stopped. |
Deactivate Tasks | Determines if schedule tasks for the specified dataset should be deactivated. If the checkbox is selected, schedule tasks defined for the defined dataset will be stopped. |
Input Type | The type of schedule task for the specified dataset that should be stopped from transferring data to Mobile Workforce Management. Valid parameter values are Load or Change. If a parameter value is not entered, both Load and Change type schedule tasks will be deactivated. |
To perform this activity, the database method for deactivating a scheduled task must have been set up with the required security settings.
As a result of this activity, a dataset and/or schedule tasks per dataset will be deactivated.
Create New
Database Task Schedule
Scheduled Database Tasks