This activity is used to create severities that will be connected to fault types in Failure Analysis Setup Navigator. For example, define severity 1 as the highest level of severity to be connected to a fault type.
N/A
As a result of this activity, a severity is created and can be used in the Failure Analysis Setup Navigator/Fault Types tab.
Work Order and PM Basic Data
Work Order and PM Basic
Data/Severities