Use this dialog box to reset the required start and/or end dates on the maintenance order. If an entire maintenance visit is decided to be performed at an earlier or a later date than initially planned, the maintenance order can be moved to a new required start date and simultaneously the planned Execution Logic Structure (ELS) that is connected to it will be moved without having to regenerate the ELS.
Perform Execution Logic
Structure Sequencing
Replan
Maintenance Order