Creating and Releasing Call Offs—Key Exercises
Required Data
Awarding Sub Contract
Purpose: The purpose of this
exercise is to show you the required data that is used in the exercises below.
-
Award the sub contract to the most
suitable supplier.
General exercise for
Awarding Sub Contract
Main Exercise
Purpose: The main purpose of this exercise
is to show you how to create and release call offs on the sub contract. You will
also
learn how to enter call off values for each item and how to call off the full
amount for all items on a sub contract. In addition, you will also learn
how to print a preliminary call off (i.e., a call off that is not yet released),
release the call off and print the completed/official call off document that is
to be handed over to the supplier. Lastly, you will learn how to amend the
committed cost that is reported back to the connected project activity.
Windows:
Sub Contract
Sub Contract Call Off Items
- Open the
Sub Contract window.
-
Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off
tab and create a new record (F5).
- Save the record (F12).
- Open the
Sub Contract window.
- Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off tab and select
the desired call off.
- Right-click and click Call Off Items. The
Sub Contract Call Off Items window opens.
- In the Call Off Value field (found in the
lower table), enter the call off value for each contract item.
- Save the information (F12).
- Open the
Sub Contract window.
- Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off tab and select
the desired call off.
- Right-click and click Call Off Items. The
Sub Contract Call Off Items window opens.
- To call off the full amount for all items, select
the corresponding sub contract line(s), right-click, and then click Call
Off Full Amount.
- Verify that the full amount is called off in the
Call Off Value field for each item.
- Save the information (F12).
- Open the
Sub Contract window.
- Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off tab and select
the desired call off.
- Right-click and click Print Call Off.
- Enter the relevant settings and click OK to
print out the preliminary call off on your local printer.
- Open the
Sub Contract window.
- Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off tab and select
the desired call off.
- Right-click and click Release.
- A message requiring approval of the step appears,
click Yes.
- Verify that the call off is in the Released
status.
- Optionally, you can revert the release of a call off by right-clicking the call off, and then clicking Unrelease.
Purpose: The purpose of this
exercise is to show you how to amend the committed cost for the sub contract
item and connected activity.
Prerequisite: The project
connection must have been changed for the sub contract item.
- Open the
Sub Contract Call Off Items
window.
- Populate (F2) or query (F3) for the desired call off.
- In the lower table, right-click the desired sub
contract item, and then click Amend Committed Cost. The
Call
Off Item Activities dialog box opens.
- Change the value in the Amount field.
- Click OK.
- To create a new connection, click New.
- In the Activity Sequence field, enter
another project activity sequence. Click List to select the valid
value.
- In the Amount field, enter the committed
cost that is to be reported to the project activity.
- Click OK.
- To remove a connection, click Remove.
- Click OK.
- Open the
Sub Contract window.
- Populate (F2) or query (F3) for the necessary sub
contract.
- Click the
Call Off tab and select
the desired call off.
- Right-click and click Print Call Off.
- Enter the relevant settings and click OK to
print out the call off on your local printer.