You should have completed the specified exercise before you start this one. In this exercise, basic data is set up that will be used in this exercise.
Purpose: The purpose of this exercise is to show you how to generate production schedules manually for a production line.
Windows:
Production Schedule by Line
Field | Value |
Part No: | 61–900 |
Schedule Generation Option | Generate schedule in date range for start and end quantities, or use step quantity |
Date Interval | From Date = today
To Date = today + 14 days Frequency in Days = 1 |
Schedule Quantity | Starting Quantity = 10 |
4. Click OK.
Windows:
Production Schedule by Line
Field | Value |
Part No: | 61–900 |
Schedule Generation Option | Generate schedule in date range for start and end quantities, or use step quantity |
Date Interval | From date = today
To date = today + 14 days Frequency In Days = 2 Check Distribute Within Day Distribution Method = Within Period Frequency in Minutes = 320
|
Schedule Quantity | Starting Quantity = 10
Step Quantity = 1 |
4. Click OK, and analyze the results (note the dates and quantity per date/schedule).
Windows:
Production Schedule by Line
or
Production Schedule by Line Part
Field | Value |
Part No: | 61–900 |
Schedule Generation Option | Your choice |
Date Interval | Your choice |
Schedule Quantity | Your choice |