Kanban Planning Tools - Exercises
Basic Data Setup
Create a Kanban Circuit
Purpose: The purpose of this exercise is to set up the
basic data required to run Kanban Planning and Calculation.
- If you haven't done so already, set up your site for Kanban circuits,
create and activate a Kanban circuit.
General exercise for Kanban
Circuits
Setting up Kanban Simulation and Demand Retrieval Preferences
Purpose: The purpose of this exercise is to set up
Kanban Simulation and Demand Retrieval Preferences that required to run Kanban
Simulation.
Windows:
Kanban Basic Data
- Open Kanban Basic Data window. Query for your site in
Setup
tab.
- In Simulation Preferences Group Box, select Full Kanbans for
Starting Supply and Recalculate for Initial Supply
Quantities fields. Save your changes.
Main Exercise
Purpose: The purpose of this exercise is give you a
quick tour of some of the Kanban Planning tools. This exercise will take
you through retrieving demand. calculating the Kanban, reviewing the results
using the Kanban Circuits window, and accepting the
recalculation.
Windows:
MS Level 1 Part
Perform Site MRP
Kanban Circuit
Retrieve Demand from MS/MRP
- Open the
MS Level 1
Part window..
- Create a new record (F5) and enter part RW100. Assign planning and demand
time fences. Save the information.
- Click
Register Forecast tab. Create forecasts for MS set 1. Allow the forecast to vary between
22 to 34 parts per day during a 10-14 day period.
- Right click and then click Run MS - One Part. Open
Perform Site MRP
window and perform MRP.
- Open the
Kanban Circuit window. Query the Kanban Circuit for
RW100 in your site.
- Click
Calculation Inputs tab. Right click and then
click Retrieve Demand. Select MS/MRP as the source in
the pop-up window. Click OK.
- Right click and then click Show Kanban Demand. Verify that demand is there.
Perform Kanban Calculation
- Open the Kanban Circuits window. Query for RW100 in your
site.
- Click
Calculation Inputs tab. Enter 32 for Demand
Quantity and 1 for Leadtime.
- Verify that the field Calculation Type is set to Number of
Kanbans and Formula Type is set to Basic. Save your
changes.
- Right click and then click Calculate Kanbans. Go to
Recalculation tab to see the calculation result.
- Change Formula Type and calculate Kanbans. What is the result?
- Go back to
Calculation Inputs tab. Set Basic for Formula Type
field.
- Click
Recalculation tab. Enter 40 in
the Lot/Transfer Qty field.
- Right click and then click Calculate Kanbans.
- Go to
Recalculation tab. Analyze the results.
- Change the selection in Formula Type and calculate Kanbans. Analyze the
results.
- Test on your own. (Tips: Change Calculation Type, change Safety Stock,
etc.)
Perform Kanban Simulation
- Open the
Kanban Circuit window. Query the Kanban Circuit for
RW100 in your site.
- Click
Calculation Inputs tab. Right click and then
click Retrieve Demand. Select MS/MRP as the source in
the pop-up window. Click OK.
- Right click and then click Show Kanban Demand. Verify that demand is there.
- Close the
Kanban Demand window
- In the
Kanban Circuit window, right click and then click Run Simulation.
- In
Kanban Simulation dialog box, verify that the fields Starting Supply
and
Initial Kanban Quantities have Full Kanbans and Recalculate
respectively. Click OK.
- In Kanban Circuit window, right click and then click Show Kanban
Demand.
- Analyze the result of the simulation. Check the column Stockout Alert.
Have you got any stockouts? (If you didn't have any
stockouts, go to
MS Level 1
Part window and change the
forecast so that you will have a peak demand in the middle of the forecast
period. Run Master Scheduling for one part and perform an MRP and start with
no 2 above)
- Close the
Kanban Demand window.
- In the
Kanban Circuit window, right click and then click Run Simulation.
- In
Kanban Simulation dialog box, select the checkbox Iterate for
Stockout keeping other parameters in the dialog box as they are. Click OK.
- In Kanban Circuit window, right click and then click Show Kanban
Demand.
- Analyze the result of the simulation. Did the stockouts disappear?
- Close the
Kanban Demand window.
- Try running a simulation on your own. Run one with different alternatives,
e.g., with or without iterations, Full Kanbans or snapshot within lead time,
or Recalculate or Use values from circuit. Analyze the results and the
effects on the
Cards tab.