IMPORTANT |
It is extremely important that you set up and work within your own site to maintain your data integrity. If you work within any other site, you will compromise your own exercise data as well as the data of other students. Predictable exercise results require that your data be isolated in your own site. |
Note: Throughout this document, please replace any occurrences of XX with your initials, group ID, user ID or other unique prefix, in order to separate your training data from that of other students.
Purpose: The purpose of this exercise is to create the required data that will be used to create multilevel repair shop orders.
General exercise for View Multi level As-Built Structure
Purpose: The purpose of this lesson is to create multilevel repair shop orders.
Windows:
Shop Order
Verify that the consumable components existing in the repair product structure of part XX5200 have not been copied to the Shop Order/Materials tab. This is because it is a multilevel repair shop order. Also notice that you cannot change the effective structure revision/alternate using the right mouse button menu option Update Allocations and/or Operations/Update Structure Revision and/or Alternates.
Note: You are not allowed to create a multilevel repair shop order for a serialized part with lot size more than 1.
Verify that the consumable components existing in the repair product structure of part XX5200 have not been copied to the Shop Order/Materials tab. This is because it is a multilevel repair shop order. Also notice that you cannot change the effective structure revision/alternate using the right mouse button menu option Update Allocations and/or Operations/Update Structure Revision and/or Alternates.