This activity is used to pack parts into the handling units.
This activity can be executed either manually per shipment, manually for all shipments connected to a consolidated shipment, or automatically in the shipment flow. Whether or not to automatically pack into handling unit, is controlled by the shipment type of the shipment. In the shipment type, it can be defined that pack into handling unit should be performed at the execution of a main activity in the shipment flow e.g. reservation, report picking, delivery. A consolidated shipment is defined as one departure of several shipments from the specified site, to all the delivery addresses of the connected shipments. When triggered from the consolidated shipment, the pack into handling unit is executed for all connected shipments.
The parts are packed into the handling units as specified in the handling unit structure.
Shipment
Consolidated Shipment
Consolidated Shipments
Shipment
Shipment/Handling Unit
Structure/Unattached Shipment Lines
Consolidated Shipment
Consolidated Shipments
To manually pack into handling unit on a shipment:
Optionally:
1. Open the Shipment
window and search for the required shipment.
2.
Right-click and and then
click Pack into Handling Unit(s).
3. All unattached shipment lines on the
shipment are packed into the handling unit defined on the unattached
shipment lines.
To automatically pack into handling unit:
To manually pack into handling unit for all shipments connected to a consolidated shipment: