Perform Due Calculation for LLP Tasks
Explanation
This activity is used to perform the due calculation for LLP tasks for a
given serial. The calculation will be done for the serial, based on the
registered average operational value per month and the life limited information
defined for the serial. In addition, the due calculation will calculate the
remaining life and drop-dead date and create a LLP task for the given serial,
provided the serial part number is defined as a life limited part and it has
reached the days of the forewarning period.
Apart from manually performing the due calculation for a serial (as described in
this activity), scheduled tasks exist to automatically calculate due dates for
all life limited serials. The Life Limited Part Calculation scheduled task will
be used to calculate the life limit of all serials defined as life limited
parts. For more information on the scheduled tasks, refer to the activity
Adjust and Verify Background Job for Calculations of LLP Tasks.
Prerequisites
- An average operational value (per month) for the serial must exist.
- For life limited parts to be calculated, life limited information must
be defined for the serial.
- The serial available for due calculation, cannot have an operational
status of Planned for Operation and cannot be a locked serial.
- The LLP tasks that are in a planning state
(i.e., in the Planned in Scope, Incomplete or Under
Preparation status) must be connected to a maintenance order that is not
yet released.
System Effects
- When the serial part number is defined as a life limited part (LLP) and
the due date calculated is within the defined number of days forewarning,
the calculation creates a maintenance task for the serial.
- The due calculation for LLP tasks will handle
tasks that are included on maintenance orders not yet released.
Window
Serial Maintenance
Task Summary
Change Work Scope Tasks
Related Window Descriptions
Serial Maintenance
Serial Maintenance/Life Limited Serials
Task Summary
Task Summary/LLPs
Change Work Scope Tasks
Change Work Scope Tasks/LLPs
Procedure
Use the following procedure to run the due calculation for LLP tasks for a
serial.
- Open the Serial Maintenance window.
- Query (F3) for the serial for which you will run the task calculation.
- Right-click anywhere in the header of the window and then click
Perform Due Calculation to open the Perform Due Calculation
dialog box.
- Select the LLP Calculation check box to calculate LLP tasks.
- If you want to perform task calculation for all serials in the serial
structure, select the Calculate Entire Structure check box.
- To perform the task calculation as a background job, select the Run
in Background check box.
- Click OK.
- When the task calculation is finished, you can view the calculated drop
dead date for the serial in the Life Limited Serials tab of
the Serial Maintenance window.
If IFS/Complex MRO is used, the following procedure can be used to calculate
due dates for the LLP tasks which are to be performed during a shop visit:
- Open the Task Summary window or the Change Work
Scope Tasks window and query (F3) for the overhaul object and/or the
MRO work order number you want.
- Right-click anywhere in the header, and then click Perform Due
Calculation.
- The calculated due dates can be viewed in the
LLPs tab found in the Task Summary window and in
the Change Work Scope Tasks window.