Activate Control Plan Template
Explanation
Use this activity to activate your
control plan template revision. The control plan template must be Active to be
used. A control plan template in state Active cannot be changed.
Prerequisites
A control plan template revision in
state Created must exist. If a checklist exists, then all checklist items must
be approved.
System Effects
As a result of this activity, the
control plan template will be in Active status. If you are activating a new
revision of an already existing template:
- Control plans in state Created
referring to the template will be updated with the new revision
- Control plans in state Active
referring to the template will be phased out and replaced by a new revision
- Reference to Existing Active
Control Plans will be removed if the New template revision is activated.
- Affected shop order will
be updated with New control plans.
Window
Control Plan Template
Related Window Descriptions
Activate Control Plan Template Assistant
Procedure
- In the control plan template
header, right-click and then click
Active
to change the control plan template to status Active. If the template
revision is referred by any control plans, the
Activate Control Plan Template
Assistant window will
open.
- In the
Phase In Date
field, you can enter any date in the future. If any existing control plans
are phased out, the phase out date will be today's date.
- Depending on the type of the
control plan template you will be guided through different steps.