Set Up Basic Data to Enable Overhead to Project Labor Time
Explanation
In order to have an overhead cost added to the project
time transaction postings, you need to set-up the following:
- Posting control for posting types PRJT1, PRJT2,
PRJT3, and PRJT4 must have been defined.
- Cost details must have been entered in the
Cost Details Basic Data window in IFS/General Data for Inventory
and Distribution.
In the
Cost Details Basic Datawindow
you need to do the following:
- Select the preferred cost source indicator.
- Enter the cost source ID's that should be used, and
their overhead rate.
- Connect the cost source ID to the corresponding cost
source indicator.
Window
Cost Details Basic Data
Related Window Descriptions
Cost Details Basic Data
Procedure
N/A.