View Orders per Work Center

Explanation

Use this activity to study the results of CRP, i.e., the work load of a certain work center or department on a specific day. Work load is summarized per day and per work center. This means, for example, that even if only four parts are processed in a specific work center on a specific day, the result is still displayed as a total workload. By using this activity, you can study which shop orders, DOP orders, and shop order requisitions create workload for a specific work center. All shop order requisitions generated automatically or entered manually are considered. Shop order requisitions generated by the system can come from MS, MRP, or an order point list.

Prerequisites

The capacity requirements calculation must have been performed.

System Effects

There are no system effects.

Window

Orders per Work Center

Related Window Descriptions

Orders per Work Center

Procedure

  1. Retrieve the work center for which you want to study the work load.