Select Structure Depth Full Level

Explanation

Use this activity to control whether the DOP structure should be created only for the DOP parts or for all parts in the structure, regardless of the supply code. The two possible values are DOP Parts and Full Level. The latter should be seen as an exception, but it can be used in the event that pegging and actual costing is required for all parts on all levels in a part's structure. Structure depth also determines whether DOP orders for non-DOP parts added manually should have pegged orders (if Full Level) or not (if DOP Parts). The default value is DOP Parts.

Prerequisites

This activity requires that a DOP header has been created.

System Effects

As a result of this activity, DOP orders are created for all parts in the product structure when the DOP structure is created. New DOP orders added manually will have Create Pegged set to Pegged Orders as default.

Window

DOP Header

Related Window Descriptions

DOP Header
DOP Header/Detail

Procedure

  1. Select the DOP order to change.
  2. Choose Full Level from the Structure Depth list box in the Setting group box.
  3. Click Save.