Connect Permit Type to Standard Job

Explanation

Use this activity to connect one or more permit types to a separate or route standard job. Permit types ensure that the maintenance work in the facility can be performed under safe conditions. 

An isolation can also be connected to the permit type. Isolations describe how a certain part of the facility should be shut down temporarily, so that the specified work can be carried out under safe conditions. 

Prerequisites

System Effects 

As a result of this activity, permit types and isolations (where applicable) are connected to the standard job. 

Window

Separate Standard Job 
Route Standard Job

Related Window Descriptions

Separate Standard Job 
Separate Standard Job/Permit

Route Standard Job
 
Route Standard Job/Permit

Procedure

  1. Open either the Separate Standard Job window or  the Route Standard Job window, and create a new record or query for an existing one (F3).
  2. Click the Permit tab and create a new record (F5).
  3. Enter a value in the Permit Type field. Use the List of Values to select a suitable value.
  4. Enter a value in the Isolation ID field. Use the List of Values to select a suitable value. 
  5. Select the Generate check box if you want a permit to be created during the work order generation process.
  6. Save the information (F12).