Use this window and its tabs to view and analyze information on the events that caused an A (Availability), P (Performance), Q (Quality) or APQ cost within your production unit. The events used during an APQ calculation will be displayed in the Availability, Performance and/or Quality tabs, where it will be possible to view information per event by selecting the right mouse button option Show All Events. Alternatively, you can view information on all events by using the APQ tab.
Note: If the events are grouped in any order, a monetary sum will be displayed for each group.