Reschedule Shop Order Material Line

[About Manufacturing Visualizer] [About Visualization for Part Availability] [About Shop Order Infinite Scheduling]

[To Manufacturing]

Usage

Use this dialog box to trigger a rescheduling of a shop order material line and optionally the shop order operation requiring the material.

The proposed Required Date in the dialog box will be set according to the date where the shop order material demand is released in the chart but can be manually edited. By selecting the Reschedule Shop Order Operation(s) check box , the operation which to the material line is connected will be rescheduled. Additionally, Compress Operations check box can be used to avoid slack between operations. If material line is not connected to any operation, the first operation of the order will be considered.

Activity Diagrams

Handle shop order

Activities

Reschedule shop order material line using drag-and-drop