Calculate Manufacturing Lead Time

[To MFG Standard] [About Manufacturing Lead Time Calculation]

Usage

Use this dialog box to calculate the manufacturing lead time of a part. This is calculated from the operation list and default lot size of the part; it considers the setup, move, and operation times, as well as the efficiency factor entered for the operation. Calculation will also consider about overlap for all the sites. The system also considers information about queue time and shifts, i.e., the number of work hours per day from the work center where the operation is performed. Controls button can be used to change the controls in calculating manufacturing lead time. You specify whether you want to run the calculation for individual parts or for all parts in a specific site. The calculation runs in the background, allowing you to continue working with the system as usual. The results of the lead time calculation are filled in the fields in Inventory Part/Manufacturing and in Inventory Part/Acquisition. The calculation separates the lead times into fixed and variable lead times by day and by hour. The times are displayed independent of lot size. 

Activity Diagrams

Manage routings

Activities

Calculate manufacturing lead time