Calculate Cost per Structure/Routing
Explanation
Use this activity to calculate costs for different
combinations of Manufacturing and/or Prototype structure and routing.
The cost calculation for one level calculates costs for the part itself
according to the structure and routing combination and accumulates the
previously calculated costs for components. If components do not have costs in
the cost set being calculated, it retrieves cost information
from Cost Set 1 for the components, if any.
Prerequisites
This activity has the following prerequisites:
- Cost sets must have been defined.
- A Manufacturing and/or Prototype structure
and routing must have been created.
- The part cost must have been calculated for
components in order to get the latest costs for component parts.
System Effects
As a result of this activity:
- Costs will be calculated for the given combination
of structure and routing.
- Routing cost type and part BOM cost records will be created for the part
routing cost.
Window
Cost Build-Up per
Structure/Routing
Related Window Descriptions
Cost Build-Up per Structure/Routing
Procedure
To perform this activity in the Cost Build-Up per
Structure/Routing window, follow these steps:
- Open the Cost Build-Up per Structure/Routing
window and create a new record.
- In the Site field, click List and
select the site for which you want to perform the cost calculation.
- In the Part No field, click List
and select the part for which the calculation should be performed.
- In the Cost Set field, click List
and select the cost set for which you want to perform the cost calculation.
- In the Struct Rev field, click
List and select the structure revision you want to perform the cost
calculation.
- In the Rout Rev field click List
and select the routing revision you want to perform the cost calculation.
- If you want to change the automatically fetched value in the
Struct Alt/Rout Alt field, click List in the Struct
Alt and Rout Alt fields and select the alternatives.
- If you want to calculate the cost for a particular lot size, change the
Lot Size which was automatically fetched from the Std Lot Size.
- Save the record.
- Click Calculate in order to calculate the
cost for the given combination of structure and routing.