Use this activity to study a bar graph of the workload for a specific work center during a specified interval of time. You also can study the workload for different master schedule sets, since these can have different forecasts. In this way, you can see how different forecasts burden the work centers. The workload shown in the graph is divided per master schedule set. You specify this when you select the work center whose workload you want to view. If you work with dynamic periods, specify the site from which you want to retrieve the periods. This does not mean that a workload is displayed per site. If a work center is used by several sites in the same master schedule set, the total workload for all sites is displayed.
Note: Regardless of the period unit, the system does not consider the site where the workload originates, since master schedule sets are not site-dependent.
This activity requires that the calculation of RRP must have been performed.
There are no system effects as a result of performing this activity.