Use this dialog box to change the default values for the period range to be used for generating the detailed MS graph. You can also determine whether you want the graph to include unconsumed or full forecast data. In the graph's display of cumulative data, you can determine whether you want it to include unconsumed forecast or unconsumed supply data.
A note regarding the default period values: When you type a new period number in the Begin Period No field, the Range Begin Date field displays the first date for that period. Likewise, when you type a new period number in the End Period No field, the Range End Date displays the concluding date for that period number. The default value for the beginning period number is based on the site date of the site specified in the Detailed MS Graph window. The default value for the ending period number is based on the planning time fence date for the part number selected in that window. If the site date or the planning time fence date falls before the first period number, the period number 1 is used. If the site date or the planning time fence date falls outside the maximum period number, the maximum period number is used. When the dialog box is first opened, the site date and the planning time fence date appear in the Period Begin Date and Period End Date fields.
Perform
MS level 1
Perform MS level 0