Update Structure Revision and/or Alternative

Explanation

Use this activity to select a different revision and/or alternative of the structure for the shop order. (The current revision is selected automatically when the system registers a shop order.)

If the selected shop order is in the status of parked and the status before parked was reserved or started, only the revision and/or alternative on the shop order head will be changed.

Notes: This activity does not support configured parts. The activity Update Revision for configuration can be used instead, as alternates are updated from configuration rules.

For a shop order that was in the status of Reserved or Started before Parked, all updates on the Shop Order window Material tab have to be done manually. In some circumstances update is also possible to be done in the Compare Shop Order with Structure and Routing window.

Prerequisites

System Effects

As a result of this activity,

Window

Shop Order
Shop Orders

Related Window Descriptions

Shop Order
Shop Orders
Update Structure Revision and/or Alternate

Procedure

  1. Right-click and then click Update Structure Revision and/or Alternative. The Update Structure Revision and/or Alternate dialog box appears.
  2. In Update Structure Revision and/or Alternate, select the desired structure revision and alternative combination in the Revision field. Click List to select from available valid combinations.
  3. To change only the alternative, select the specific alternative in the Alternate list.
  4. Click OK.