Update Revision for Configuration
Explanation
Use this activity to select a different revision of the structure/routing for shop orders
with configured parts. (The current
revision is selected automatically when the system registers a shop order.)
Prerequisites
- Shop order should be for a configured part, and the configuration should
be in the complete state.
- This activity requires that the shop order is in the state of Planned or Released.
- If a material line is manually pegged against a purchase order line or a shop order, the pegging has to be removed first.
System Effects
As a result of this activity,
- The revision on the shop order head is changed.
- The Shop Order window Material tab will get changed due to the new structure revision.
- The Shop Order window
Operation tab will get changed due to the new routing revision.
Window
Shop Order
Related Window Descriptions
Shop Order
Procedure
- Right-click and then click Update Revision for
Configuratoin. The
Update
Revision for Configuration dialog box appears.
- In Update Revision for Configuration, select the desired structure/routing revision combination in
the Revision field. Click List to select from available valid combinations.
- Click OK.