Once you have generated and reviewed the proposed production schedules, you can confirm the proposed schedules as new active production schedule for the line. You can either completely replace the existing schedule for that time range or simply add the proposed schedule as additional quantities to the existing schedule.
A proposed schedule must exist.
Production schedule records will be created for the line either as a complete replacement to the existing schedule for the affected date range, or as additional schedule quantities for the same date range. If the production schedule is added as additional quantities, any existing schedule for the same part, date, and default sequence (999) will be updated with the additional quantity. Otherwise, new schedule records will be created.