This activity is used to calculate the capacity for the employees connected to labor classes on a site. The calculation can also include a capacity calculation for manufacturing competencies. You can perform the calculation for one site at a time or for all the sites to which you have access. You can also schedule this as a scheduled task. The calculation is done from the date of initiation to the date specified in the Calculation to Date field. When there is no date specified in the Calculation to Date field, the last date that an operation is scheduled with a labor requirement is considered as the calculation to date.
To perform this activity, you will need to have at least one employee connected to a labor class on the site and that employee needs to be available for at least one day in the time interval.
As a result of this activity, the available and theoretical man hours for labor class and each competency profile stored in the database for each day is updated. The stored data will be later used to generate the Employee Competency Demand Graph window as well as the available and theoretical capacity for manufacturing labor class.
Calculate Employee Capacity for Manufacturing
Manufacturing Labor Class
Calculate Employee Capacity for Manufacturing
Manufacturing Labor Class
You can perform the capacity calculation either as a background job executed once (Procedure A) or by scheduling the task to execute as a background job at a specified time or on a (Procedure B).
Procedure A:
Procedure B:
Note: Scheduled tasks can be seen in the Scheduled Database Tasks window.
The Calculate Employee Capacity for Manufacturing dialog
box can be opened by right-clicking the header of the Manufacturing Labor Class
window.