Complete Resource Breaks

Explanation

This activity is used to complete a resource break which is in Scheduled state. The status of the break changes to Finished. A resource break in Finished state has no effect on the shop order schedule. Resource breaks are taken into account only when the orders are scheduled using Constraint Based Scheduling (CBS), not when using the Shop Order Infinite Scheduler.

Prerequisites

A resource break having Scheduled status must exist.

System Effects

As a result of this activity:

Window

Resource Break

Related Window Descriptions

Resource Break
Resource Breaks

Procedure

  1. Populate the window.
  2. Select the resource break(s) you want to complete.
  3. Right-click and then click Complete. The status of the selected break(s) changes to Finished.