This activity is used to calculate the actual task type efficiency rate. The actual task type efficiency rate shows the efficiency of a specific worker in executing a task type. This value is useful when planning the resource situation. It is the effective efficiency rate that is used in the system for planning reasons and not the actual efficiency rate. However, it is possible to update the effective efficiency rate with the actual efficiency rate at all times.
The task type efficiency rate calculation is based on the warehouse tasks that have been performed during a specified period. The calculation is grouped by site, warehouse worker, and warehouse task type.
The result of the calculation shows the efficiency of the worker, related to the standard time needed as established in Warehouse Task Basic Data/Warehouse Task Type Setup tab. The result is displayed in the Actual Efficiency Rate column in Warehouse Task Basic Data/Warehouse Worker/Task Type tab.
In order for the calculation to give any result, at least one warehouse task of this type must have been performed on this site by the specific warehouse worker during the selected period.
The actual task type efficiency rate will be calculated either for one or for all warehouse workers on a specific site, based on the warehouse tasks executed during the selected period. The actual efficiency rate is updated in Warehouse Task Basic Data/Warehouse Worker/Task Type tab.
Calculate Actual Task Type Efficiency Rate
Calculate Actual Task Type Efficiency Rate
To perform this calculation you can either do it directly (procedure A), or schedule the task as a background job (procedure B).
A. To perform a calculation directly:
B. To schedule this calculation as a background job:
.