This activity is used to reactivate an instruction (operation) revision.
To perform this activity, the instruction revision must be in the Obsolete status.
As a result of this activity, the instruction revision is set to the Active status and is available for distribution to work orders.
Instruction
Instruction/Operations
Instructions