Update Revision Data

Explanation

Use this activity to update revision data for a part in Engineering Revision Transfer Actions.

Prerequisites

This activity has the following prerequisites:

System Effects

As a result of this activity:

Window

Engineering Revision Transfer Actions

Related Window Descriptions

Engineering Revision Transfer Actions

Procedure

  1. Open the Engineering Revision Transfer Actions window.
  2. Select  the engineering revision for which you want to change the revision data.
  3. Update the revision data of your choice.
  4. Save the record.

When the Engineering Transfer is done, the update of the Product Structure Revision happens according to the state of the default alternative.
If the Product Structure default Alternative is in Tentative state it gets overwritten with the changes.
If the Product Structure default Alternative is in Plannable, Buildable or Canceled state a new Product Structure Revision is created.

If there is more than one Tentative Structures for a part then the latest Tentative Revision gets updated with the changes.
If this Tentative Structure has other Alternatives in Tentative state these will be deleted once the Engineering Transfer is done. If the other Alternatives are in Plannable, Buildable or Canceled state they will remain as they are.