Use this activity to study the effects of implementing Change Requests (CRs). It is necessary to know the consequences in order to implement the CRs as effective as possible. The result of this preliminary change study can be rejected or postponed CRs. These studies should be documented in Document Management.
New registered CRs, registered to fulfill one or several engineering requirements.
None
None