Study Cost Variance per Bucket
Explanation
Use this function to compare part costs from different buckets. You can choose to study
all buckets connected to the part, or define a variance factor for the buckets you want to
study.
Prerequisites
- The part you want to study must exist in at least two different cost sets.
- Costs must have been calculated for the part.
System Effects
Window
Part Cost Bucket Variance
Related Window Descriptions
Cost Bucket Variance
Cost Bucket Variance/Cost Build-Up/Cost Set
Procedure
- Open the Part Cost Bucket Variance window.
- Select the part for which you want to compare bucket costs.
- Select one of the radio buttons to specify whether you want to study all buckets, or
just some of them. If you select to study some of the buckets, define the variance factor
in the corresponding field.
- Click the Cost Build-Up/Cost Set tab.
- In the Cost Set list boxes, select the different cost sets for which you want to compare
the bucket costs.