Supply Detailed Task Information
Explanation
This activity is used to supply detailed information
for maintenance tasks before the tasks can be completed.
Prerequisites
To perform this activity, a task must exist. This task cannot be in the Finished status.
System Effects
As a result of this activity, detailed task information
will be supplied and the task can be completed when reaching the Work Done
status.
Window
Maintenance Order
Related Window Descriptions
Maintenance
Order
Maintenance Order/Maint. Order Str.
Maintenance Order/Maint. Order
Str./Supply Task Info
Maintenance Order/Maint. Order
Str./Supply Task Info/Fault
Maintenance Order/Maint.
Order Str./Supply Task Info/Modification
Maintenance Order/Maint. Order
Str./Supply Task Info/Oper Param
Maintenance Order/Maint. Order
Str./Supply Task Info/Material List
Procedure
- Open the Maintenance Order window
and query (F3) for the necessary maintenance order.
- Click the Maint. Order Str. tab. In
the graphical object structure, select the required task row, and then click
the Supply Task Info subtab.
- Click the Fault tab if you want to enter fault-specific information on
the task.
- You can enter or change the value in the Fault
Code and/or Cause Code fields. Use the List of values to select
valid values.
- Save the information (F12).
- Click the Modification tab, to enter information on modification tasks. You
can enter or change the next execution type and/or update information on the
rename of a serial.
- In the Next Exec. Step field, select the
new execution type. Valid values are: Initial Inspections,
Continued Inspections and Terminating Action.
- Select the Terminate Inspections check box
if you want to terminate the inspections of a modification.
- In the Exec. Remark field, enter any
information on the modification execution.
- In the Rename Serials area you can enter or
change rename-specific information on the serial.
- Save the information (F12).
- Click the Oper Param tab to enter
operational parameter values on a task when finishing the task.
- Right click on the table of the window, and then
click Suggest Operational Values. The Maintenance Date for
Default Values dialog box opens.
- Enter a value in the Maintenance Date
field.
- Click OK.
- Save the information (F12).
- Click the Material List tab to enter information on the material used on the
maintenance task processed as a simplified work order. Note that this tab is
only made available for tasks with distribution type Simplified Work
Order.
- Create a new record (F5) in the table of the
window.
- In the Part Number field, enter the part
number of the consumed material. Use the List of Values to select a valid
value.
- In the Quantity field, enter the quantity
of material consumed.
- Save the information (F12).